PVS Ch10 Sizing PV Systems Quiz

PVS Ch10 Sizing PV Systems Quiz

12th Grade

14 Qs

quiz-placeholder

Similar activities

Relativitas Khusus

Relativitas Khusus

12th Grade

10 Qs

AP Physics C Intro to Electrostatics

AP Physics C Intro to Electrostatics

11th - 12th Grade

14 Qs

Free Fall

Free Fall

9th - 12th Grade

9 Qs

Electrostatic Potential

Electrostatic Potential

KG - University

13 Qs

Gelombang

Gelombang

12th Grade

10 Qs

SÓNG ÂM - BÀI TẬP

SÓNG ÂM - BÀI TẬP

12th Grade

16 Qs

FISIKA ASIK

FISIKA ASIK

12th Grade

10 Qs

FLUIDA STATIS

FLUIDA STATIS

10th - 12th Grade

10 Qs

PVS Ch10 Sizing PV Systems Quiz

PVS Ch10 Sizing PV Systems Quiz

Assessment

Quiz

Physics

12th Grade

Practice Problem

Hard

NGSS
HS-PS3-3, HS-PS3-1, HS-ETS1-2

+1

Standards-aligned

Created by

Kevon Kirton

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

14 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The duty cycle is the amount of time that a specific electrical load operates.

True

False

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A phantom load is a load type that draws a large amount of current, even when the load is "OFF".

True

False

Tags

NGSS.HS-PS3-1

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If the building’s loads change significantly over the course of a year, it is acceptable to use the month with lowest insolation as the design month.

True

False

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a standard charge controller, all of the system components have the same voltage.

True

False

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A common assumption in most stand-alone PV system installations is that the wiring from module to module and from the array modules to the combiner box is the same size as the wire leads that were installed on the PV modules by the manufacturer.

True

False

6.

FILL IN THE BLANK QUESTION

30 sec • 1 pt

Load __________ is the process of changing large electrical loads in a building to another form of power such as natural gas or propane.

7.

FILL IN THE BLANK QUESTION

1 min • 1 pt

A(n) __________ PV system needs to be sized so that it can supply the total electrical load of the building it serves.

Tags

NGSS.HS-ETS1-2

NGSS.HS-PS3-1

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?