MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the primary purpose of an AUXILIARY SYSTEM in a building?
To replace the main system permanently
To serve as a substitute or reserve in case of need
To reduce electricity consumption
To make the building more expensive
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is NOT considered an auxiliary system device?
Fire alarm system
Communication system
HVAC system
Building management system
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does a smoke detector primarily detect?
Fire
Smoke
Water leaks
High temperatures
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which device is commonly used to manually activate a fire alarm system?
Modem
Smoke detector
Manual fire alarm pull station
Telephone
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is an example of a communication device in an auxiliary system?
Fire alarm
Modem
Smoke detector
Water flow sensor
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following electrical symbols is commonly used in auxiliary system drawings?
Battery symbol
Transformer symbol
Smoke detector symbol
Grounding symbol
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is one key element of the Local Building Code?
Only new buildings need to comply
Codes do not apply after the building is completed
Owners must ensure occupants follow fire code regulations
The code only applies to commercial buildings
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?