1.8- Performance Quality Control & Assurance

1.8- Performance Quality Control & Assurance

11th Grade

16 Qs

quiz-placeholder

Similar activities

GCSE Design and Technology: Production Techniques Quiz

GCSE Design and Technology: Production Techniques Quiz

10th Grade - University

15 Qs

Engineering Technology Foundations Sample

Engineering Technology Foundations Sample

9th - 12th Grade

20 Qs

PLTW Engineering Essentials

PLTW Engineering Essentials

11th Grade

20 Qs

Production Planning Quiz

Production Planning Quiz

11th Grade

18 Qs

Unit 11- quiz B

Unit 11- quiz B

11th Grade

17 Qs

TLevel Quality Management and Improvement Principles

TLevel Quality Management and Improvement Principles

11th Grade

15 Qs

PS(09/10/24): Engineering Design Teams Quiz

PS(09/10/24): Engineering Design Teams Quiz

11th Grade

12 Qs

1.8- Performance Quality Control & Assurance

1.8- Performance Quality Control & Assurance

Assessment

Quiz

Engineering

11th Grade

Easy

Created by

Ben Kinnison

Used 1+ times

FREE Resource

16 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The significance of a 'culture of quality' is to ensure that ______.

products are made quickly

quality is everyone's responsibility

only managers care about quality

quality is ignored

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one key difference between quality assurance (QA) and quality control (QC)?

A) QA focuses on process, QC focuses on product

B) QA is product-oriented, QC is process-oriented

C) QA and QC are the same

D) QA ignores quality.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the three key data points collected in manufacturing performance monitoring?

A) Time, Quality, Cost

B) Speed, Efficiency, Output

C) Time, Speed, Quality

D) Cost, Output, Efficiency

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Monitoring in manufacturing involves collecting data relating to ______.

A) time, quality, and cost

B) speed, efficiency, and output

C) time, speed, and quality

D) cost, output, and efficiency

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a key performance indicator (KPI) used to measure employee manufacturing performance in engineering and manufacturing?

A) Operator efficiency

B) Employee satisfaction

C) Customer feedback

D) Market trends

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fill in the blank: One of the key performance indicators (KPIs) is the ______, which measures the time between failures.

Mean time between failures (MTBF)

Production deadlines

Operator efficiency

Cost of scrap

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During which stage do regular inspections take place throughout the manufacturing process?

A) Early inspection

B) During production (DUPRO)

C) Final inspection

D) Inwards inspection of raw materials

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?