1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Who is responsible for producing the drawing and specification for a large installation?
The sub-contractor
The clerk of works
The site supervisor
The designer
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In which room, as indicated on the drawing, would the supply intake be found?
Hall
Bedroom
Lounge
Kitchen
3.
MULTIPLE SELECT QUESTION
30 sec • 1 pt
Test instruments safe use and specific requirements are best found in?
Guidance Note 3
BS7671
Electricity at Work Regulations
GS38
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
An MCB shall comply with?
BSEN 60898
BS 88
BS 7671
GS 38
5.
MULTIPLE SELECT QUESTION
30 sec • 1 pt
A designer’s specification will identify the type of?
equipment to be installed
metering that is required
earthing that is required
All of the above
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The specification will also identify the type of?
supply transformer
metering equipment
supply cable
wiring system
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Information on a component’s installation is best sourced from?
manufacturer’s instructions
BS671
delivery notes
on site guide
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?