
T Level CH3.1.1
Authored by Kevin Turner
Construction
12th Grade

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
14 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
Which of the following is NOT a factor designers consider for good design?
Aesthetics of the building
Access and egress
Color of the building
Energy efficiency
2.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
What is a brownfield site?
Areas previously developed
Areas with no physical evidence of use
Areas used for farming
Areas with historical landmarks
3.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
What should designers and clients decide after determining design aspects?
Form of construction for the superstructure
Color of the building
Number of floors
Type of windows
4.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
What is the purpose of an Environmental Impact Assessment (EIA)?
To identify significant effects on the environment of proposed construction projects
To evaluate the energy efficiency of a building
To manage waste on a construction site
To ensure compliance with building regulations
5.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
How long are EPC assessments valid for domestic properties?
Ten years
Five years
Two years
One year
6.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
What does EPC stand for?
Energy performance certificate
Environmental planning certificate
Energy protection certificate
Environmental performance certificate
7.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
What is the least efficient energy rating an EPC can award?
G
F
E
D
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?