Understanding Construction Design Principles

Understanding Construction Design Principles

12th Grade

20 Qs

quiz-placeholder

Similar activities

Construction info & data Quiz PPT 3

Construction info & data Quiz PPT 3

12th Grade

15 Qs

8202 211 ppt1 Health & Safety in the Construction Industry Quiz

8202 211 ppt1 Health & Safety in the Construction Industry Quiz

12th Grade

15 Qs

Quiz Kontrak Konstruksi

Quiz Kontrak Konstruksi

12th Grade

20 Qs

Life Cycle Assessment in Construction- U9.BTEC_L3-U4-U1_HNC

Life Cycle Assessment in Construction- U9.BTEC_L3-U4-U1_HNC

12th Grade

18 Qs

Construction Quiz End of Unit

Construction Quiz End of Unit

12th Grade

20 Qs

202 Revision Extra questions

202 Revision Extra questions

12th Grade

20 Qs

Construction Industry Trivia Challenge

Construction Industry Trivia Challenge

12th Grade - University

15 Qs

Understanding UAE Construction Contracts

Understanding UAE Construction Contracts

12th Grade

20 Qs

Understanding Construction Design Principles

Understanding Construction Design Principles

Assessment

Quiz

Construction

12th Grade

Medium

Created by

David EJEH

Used 1+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first stage in the RIBA Plan of Work?

Concept Design

Strategic Definition

Technical Design

Construction

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which role is primarily responsible for the overall coordination of a construction project?

Architect

Quantity Surveyor

Project Manager

Structural Engineer

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which construction method involves assembling components on-site?

Prefabrication

Modular Construction

Traditional Construction

3D Printing

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main advantage of using Design and Build procurement?

Lower initial costs

Faster project completion

Greater design flexibility

Increased client control

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of contract is most suitable for projects with a well-defined scope?

Cost Plus

Lump Sum

Time and Materials

Unit Price

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At which RIBA stage is the detailed design developed?

Stage 1

Stage 2

Stage 3

Stage 4

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who is responsible for ensuring the structural integrity of a building?

Architect

Structural Engineer

Quantity Surveyor

Site Manager

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?