Understanding Construction Design Principles

Understanding Construction Design Principles

12th Grade

20 Qs

quiz-placeholder

Similar activities

Plumbing L1 Baseline assessment

Plumbing L1 Baseline assessment

12th Grade

20 Qs

Maintenance 210

Maintenance 210

12th Grade - University

16 Qs

202 Revision Extra questions

202 Revision Extra questions

12th Grade

20 Qs

Timber Stud Partitions Quiz

Timber Stud Partitions Quiz

12th Grade

15 Qs

Understanding Structural Carcassing Timber

Understanding Structural Carcassing Timber

12th Grade

15 Qs

Pc12 - Week 3

Pc12 - Week 3

12th Grade

16 Qs

8202 211 ppt1 Health & Safety in the Construction Industry Quiz

8202 211 ppt1 Health & Safety in the Construction Industry Quiz

12th Grade

15 Qs

Understanding UAE Construction Contracts

Understanding UAE Construction Contracts

12th Grade

20 Qs

Understanding Construction Design Principles

Understanding Construction Design Principles

Assessment

Quiz

Construction

12th Grade

Medium

Created by

David EJEH

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first stage in the RIBA Plan of Work?

Concept Design

Strategic Definition

Technical Design

Construction

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which role is primarily responsible for the overall coordination of a construction project?

Architect

Quantity Surveyor

Project Manager

Structural Engineer

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which construction method involves assembling components on-site?

Prefabrication

Modular Construction

Traditional Construction

3D Printing

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main advantage of using Design and Build procurement?

Lower initial costs

Faster project completion

Greater design flexibility

Increased client control

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of contract is most suitable for projects with a well-defined scope?

Cost Plus

Lump Sum

Time and Materials

Unit Price

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At which RIBA stage is the detailed design developed?

Stage 1

Stage 2

Stage 3

Stage 4

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who is responsible for ensuring the structural integrity of a building?

Architect

Structural Engineer

Quantity Surveyor

Site Manager

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?