Quiz for Understand Industrial Traceability 1/4

Quiz for Understand Industrial Traceability 1/4

KG

6 Qs

quiz-placeholder

Similar activities

Kuiz - Pengurusan Rantaian Bekalan dan Industri Logistik

Kuiz - Pengurusan Rantaian Bekalan dan Industri Logistik

KG - University

7 Qs

Unit 1 Personal Narratives & Quotation Rules

Unit 1 Personal Narratives & Quotation Rules

KG - University

10 Qs

[SME18] ASSESSMENT 7-STEP PROBLEM SOLVING

[SME18] ASSESSMENT 7-STEP PROBLEM SOLVING

Professional Development

10 Qs

Google Apps Quiz Review

Google Apps Quiz Review

KG - University

10 Qs

Food Chains

Food Chains

KG - University

10 Qs

Vocab List 5: Spec

Vocab List 5: Spec

6th Grade

10 Qs

Quiz for Understand Industrial Traceability 1/4

Quiz for Understand Industrial Traceability 1/4

Assessment

Quiz

others

KG

Medium

Created by

Monroe LEE

Used 9+ times

FREE Resource

6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Definition of COC: process by which ( ) associated information are ( ) as they move through each ( ) in the relevant supply chain.

inputs and outputs; transferred, monitored and controlled; step
component and finished good; produced; step
objects; recorded; step

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Choose the right one
Traceability and Chain of Custody are the same concept.
We can realize Traceability without Chain of Costody.
A robust Chain of Custody control is necessary to enable Traceability.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

( ) is a subset of ( ).

Traceability; Chain of Custody
Chain of Custody; Traceability

4.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Choose the probable Business Steps.
harvesting,
breeding,
shipping,
receiving,
Order,

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which event contains the identifier of a parent object, and identifiers of one or more child objects.
Object Event
Aggregation Event
Transformation Event
Transaction Event

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many events should be identified in this case: Factory A received 100 PCEs Product N and send 50 PCEs to production line C right away.
2
3
4
I don't know"