Improving Infrastructure and Reducing Divide

Quiz
•
Geography
•
10th Grade
•
Medium

Fletcher Forster
Used 3+ times
FREE Resource
40 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the main purpose of the A303 Stonehenge scheme?
To reduce the number of vehicles passing through Stonehenge
To improve journey times by reducing congestion
To increase tourism to Stonehenge
To create a new tourist attraction
Answer explanation
The main purpose of the A303 Stonehenge scheme is to improve journey times by reducing congestion, which will enhance traffic flow around the area, rather than solely focusing on tourism or creating new attractions.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How much is the proposed road widening scheme for the A303 expected to cost?
£1bn
£2bn
£3bn
£4bn
Answer explanation
The proposed road widening scheme for the A303 is expected to cost £2bn, making it the correct choice among the options provided.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the expected completion year for London’s Crossrail project?
2019
2020
2021
2022
Answer explanation
The expected completion year for London’s Crossrail project was set for 2021, following several delays. This makes 2021 the correct answer among the options provided.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How many additional people will be brought within 45 minutes of central London due to Crossrail?
1 million
1.5 million
2 million
2.5 million
Answer explanation
Crossrail will bring an additional 1.5 million people within 45 minutes of central London, significantly enhancing accessibility and connectivity in the region.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which airport expansion was recommended by the commission in 2012?
A new runway at Gatwick
A new runway at Heathrow
A new Thames Estuary airport
Increasing the length of an existing runway at Heathrow
Answer explanation
In 2012, the commission recommended a new runway at Heathrow as the best solution to meet future aviation demand, highlighting its importance for the UK's connectivity and economic growth.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the cost of constructing a new runway at Gatwick airport?
£8.3bn
£9.3bn
£10.3bn
£11.3bn
Answer explanation
The cost of constructing a new runway at Gatwick airport is estimated at £9.3bn, making it the correct choice among the options provided.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the capacity of the new Liverpool2 container terminal?
1 million containers per year
1.5 million containers per year
2 million containers per year
2.5 million containers per year
Answer explanation
The new Liverpool2 container terminal has a capacity of 1.5 million containers per year, making it a significant addition to the port's infrastructure and enhancing its ability to handle increased shipping traffic.
Create a free account and access millions of resources
Similar Resources on Wayground
40 questions
British Isles

Quiz
•
7th Grade - University
35 questions
Market Equilibrium Week 2

Quiz
•
10th - 11th Grade
39 questions
Italy or Nepal earthquake?

Quiz
•
2nd Grade - University
35 questions
Sikhism

Quiz
•
9th - 12th Grade
37 questions
Southeast Asia

Quiz
•
KG - 12th Grade
35 questions
TBSHS GCSE Geography: Mexico City Mega Quiz

Quiz
•
10th - 11th Grade
40 questions
10o Geography

Quiz
•
10th Grade
40 questions
World Geography Quiz

Quiz
•
5th - 12th Grade
Popular Resources on Wayground
11 questions
Hallway & Bathroom Expectations

Quiz
•
6th - 8th Grade
20 questions
PBIS-HGMS

Quiz
•
6th - 8th Grade
10 questions
"LAST STOP ON MARKET STREET" Vocabulary Quiz

Quiz
•
3rd Grade
19 questions
Fractions to Decimals and Decimals to Fractions

Quiz
•
6th Grade
16 questions
Logic and Venn Diagrams

Quiz
•
12th Grade
15 questions
Compare and Order Decimals

Quiz
•
4th - 5th Grade
20 questions
Simplifying Fractions

Quiz
•
6th Grade
20 questions
Multiplication facts 1-12

Quiz
•
2nd - 3rd Grade