Improving Infrastructure and Reducing Divide

Improving Infrastructure and Reducing Divide

10th Grade

40 Qs

quiz-placeholder

Similar activities

Sikhism

Sikhism

9th - 12th Grade

35 Qs

Shaw North America Geography Features

Shaw North America Geography Features

9th - 12th Grade

35 Qs

Impacts of the 2004 Boxing Day Tsunami

Impacts of the 2004 Boxing Day Tsunami

10th Grade

35 Qs

AP Human Geography Unit 6 Urban Land Use

AP Human Geography Unit 6 Urban Land Use

9th - 12th Grade

45 Qs

Southeast Asia

Southeast Asia

KG - 12th Grade

37 Qs

TOURISM

TOURISM

9th - 12th Grade

35 Qs

Unit 5.3 SouthEast Asia

Unit 5.3 SouthEast Asia

7th - 12th Grade

39 Qs

UK Population and Environmental Challenges Quiz

UK Population and Environmental Challenges Quiz

10th Grade - University

35 Qs

Improving Infrastructure and Reducing Divide

Improving Infrastructure and Reducing Divide

Assessment

Quiz

Geography

10th Grade

Medium

Created by

Fletcher Forster

Used 3+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main purpose of the A303 Stonehenge scheme?

To reduce the number of vehicles passing through Stonehenge

To improve journey times by reducing congestion

To increase tourism to Stonehenge

To create a new tourist attraction

Answer explanation

The main purpose of the A303 Stonehenge scheme is to improve journey times by reducing congestion, which will enhance traffic flow around the area, rather than solely focusing on tourism or creating new attractions.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How much is the proposed road widening scheme for the A303 expected to cost?

£1bn

£2bn

£3bn

£4bn

Answer explanation

The proposed road widening scheme for the A303 is expected to cost £2bn, making it the correct choice among the options provided.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the expected completion year for London’s Crossrail project?

2019

2020

2021

2022

Answer explanation

The expected completion year for London’s Crossrail project was set for 2021, following several delays. This makes 2021 the correct answer among the options provided.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many additional people will be brought within 45 minutes of central London due to Crossrail?

1 million

1.5 million

2 million

2.5 million

Answer explanation

Crossrail will bring an additional 1.5 million people within 45 minutes of central London, significantly enhancing accessibility and connectivity in the region.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which airport expansion was recommended by the commission in 2012?

A new runway at Gatwick

A new runway at Heathrow

A new Thames Estuary airport

Increasing the length of an existing runway at Heathrow

Answer explanation

In 2012, the commission recommended a new runway at Heathrow as the best solution to meet future aviation demand, highlighting its importance for the UK's connectivity and economic growth.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the cost of constructing a new runway at Gatwick airport?

£8.3bn

£9.3bn

£10.3bn

£11.3bn

Answer explanation

The cost of constructing a new runway at Gatwick airport is estimated at £9.3bn, making it the correct choice among the options provided.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the capacity of the new Liverpool2 container terminal?

1 million containers per year

1.5 million containers per year

2 million containers per year

2.5 million containers per year

Answer explanation

The new Liverpool2 container terminal has a capacity of 1.5 million containers per year, making it a significant addition to the port's infrastructure and enhancing its ability to handle increased shipping traffic.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?