Improving Infrastructure and Reducing Divide

Authored by Fletcher Forster

Geography

10th Grade

Used 5+ times

Improving Infrastructure and Reducing Divide
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main purpose of the A303 Stonehenge scheme?

To reduce the number of vehicles passing through Stonehenge

To improve journey times by reducing congestion

To increase tourism to Stonehenge

To create a new tourist attraction

Answer explanation

The main purpose of the A303 Stonehenge scheme is to improve journey times by reducing congestion, which will enhance traffic flow around the area, rather than solely focusing on tourism or creating new attractions.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How much is the proposed road widening scheme for the A303 expected to cost?

£1bn

£2bn

£3bn

£4bn

Answer explanation

The proposed road widening scheme for the A303 is expected to cost £2bn, making it the correct choice among the options provided.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the expected completion year for London’s Crossrail project?

2019

2020

2021

2022

Answer explanation

The expected completion year for London’s Crossrail project was set for 2021, following several delays. This makes 2021 the correct answer among the options provided.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many additional people will be brought within 45 minutes of central London due to Crossrail?

1 million

1.5 million

2 million

2.5 million

Answer explanation

Crossrail will bring an additional 1.5 million people within 45 minutes of central London, significantly enhancing accessibility and connectivity in the region.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which airport expansion was recommended by the commission in 2012?

A new runway at Gatwick

A new runway at Heathrow

A new Thames Estuary airport

Increasing the length of an existing runway at Heathrow

Answer explanation

In 2012, the commission recommended a new runway at Heathrow as the best solution to meet future aviation demand, highlighting its importance for the UK's connectivity and economic growth.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the cost of constructing a new runway at Gatwick airport?

£8.3bn

£9.3bn

£10.3bn

£11.3bn

Answer explanation

The cost of constructing a new runway at Gatwick airport is estimated at £9.3bn, making it the correct choice among the options provided.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the capacity of the new Liverpool2 container terminal?

1 million containers per year

1.5 million containers per year

2 million containers per year

2.5 million containers per year

Answer explanation

The new Liverpool2 container terminal has a capacity of 1.5 million containers per year, making it a significant addition to the port's infrastructure and enhancing its ability to handle increased shipping traffic.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?