Concrete Patio Construction Quiz

Concrete Patio Construction Quiz

20 Qs

quiz-placeholder

Similar activities

Writing good introduction for data-based charts

Writing good introduction for data-based charts

9th Grade

15 Qs

Tes Training 12 (SWM)

Tes Training 12 (SWM)

Professional Development

19 Qs

Chapter 7

Chapter 7

KG - University

15 Qs

QUESTIONS REVIEW ALL

QUESTIONS REVIEW ALL

5th Grade

20 Qs

Kwéyòl Review Assessment

Kwéyòl Review Assessment

KG - University

19 Qs

Concrete Patio Construction Quiz

Concrete Patio Construction Quiz

Assessment

Quiz

others

Practice Problem

Hard

Created by

Brady Coleman

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary reason for using rebar when pouring new concrete over old concrete?

To enhance the color of the concrete
To prevent cracking at the edge of the old concrete
To speed up the drying process
To reduce the weight of the concrete

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important to wet the dirt side before pouring concrete?

To make the dirt easier to work with
To prevent the concrete from sticking to the dirt
To help the concrete cure evenly
To reduce the amount of concrete needed

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the recommended slope for the patio to ensure proper drainage?

1% slope
1.5% slope
2% slope
3% slope

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of concrete mix design is used in the video?

2000 psi with sand
3000 psi with pea gravel
4000 psi with crushed stone
5000 psi with fiber mesh

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What tool is used to create a smooth finish on the concrete after pouring?

Trowel
Broom
Float
Shovel

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of cutting joints in the concrete?

To add decorative patterns
To control where cracks occur
To speed up the drying process
To improve the strength of the concrete

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How does shade affect the drying time of concrete?

It has no effect
It speeds up the drying process
It slows down the drying process
It makes the concrete harder

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?