Slides 3. Bim 2.

Slides 3. Bim 2.

1st Grade

10 Qs

quiz-placeholder

Similar activities

EXAMEN LENGUA Y LITERATURA 1ro. BACH. II Q.

EXAMEN LENGUA Y LITERATURA 1ro. BACH. II Q.

1st - 5th Grade

10 Qs

My Life Quiz

My Life Quiz

1st - 6th Grade

13 Qs

Proactive Habits Quiz

Proactive Habits Quiz

1st - 5th Grade

10 Qs

LENGUA Y LITERATURA 8vo. A.B.  EXAMEN 1er QUIMESTRE

LENGUA Y LITERATURA 8vo. A.B. EXAMEN 1er QUIMESTRE

1st - 5th Grade

10 Qs

LENGUA Y LITERATURA DECIMO

LENGUA Y LITERATURA DECIMO

1st - 10th Grade

10 Qs

KUIZ AMALAN GAYA HIDUP SIHAT

KUIZ AMALAN GAYA HIDUP SIHAT

1st - 5th Grade

5 Qs

APORTE 1P.  2doQ. LENGUAJE 9no. A.B.

APORTE 1P. 2doQ. LENGUAJE 9no. A.B.

1st - 5th Grade

10 Qs

Sensorial Geometric Solids

Sensorial Geometric Solids

KG - 1st Grade

11 Qs

Slides 3. Bim 2.

Slides 3. Bim 2.

Assessment

Quiz

Other

1st Grade

Medium

Created by

Anthony Spiller

Used 2+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does 4D in BIM dimensions refer to?

Construction sequencing

Design modeling

Cost estimation

Energy analysis

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is linked to the visual model in 4D BIM?

Data-time related information

Cost data

Energy efficiency

Material quality

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How does 4D BIM help in construction?

By improving energy efficiency

By scheduling data-time related information

By reducing material costs

By enhancing design aesthetics

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one benefit of using 4D BIM in projects?

It increases project costs

It ensures a safely sequenced project

It delays project timelines

It complicates the design process

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does creating a mockup of assets in 4D BIM help avoid?

Increased energy consumption

Costly mistakes made later on-site

Higher material costs

Longer project timelines

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of feedback from the design team and client in 4D BIM?

To increase project costs

To avoid costly mistakes

To delay the project

To reduce energy efficiency

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which BIM dimension involves construction sequencing?

5D

6D

4D

3D

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?