Construction Cost Estimation Quiz

Construction Cost Estimation Quiz

12th Grade

15 Qs

quiz-placeholder

Similar activities

L2 Cavity wall - Cold bridging, cavity trays, lintels

L2 Cavity wall - Cold bridging, cavity trays, lintels

12th Grade

13 Qs

"BHP"

"BHP"

9th Grade - University

17 Qs

Jeziora w Polsce - Quiz

Jeziora w Polsce - Quiz

5th Grade - University

10 Qs

Construction Drawing Quiz 102 A

Construction Drawing Quiz 102 A

12th Grade

20 Qs

SMAW Equipment and Supplies

SMAW Equipment and Supplies

10th Grade - University

15 Qs

Level 2 Cold Water Plumbing Exam - Version 2

Level 2 Cold Water Plumbing Exam - Version 2

12th Grade - University

18 Qs

IFOS Construction History

IFOS Construction History

9th - 12th Grade

20 Qs

PPT 11 - Decommission systems and components

PPT 11 - Decommission systems and components

12th Grade

11 Qs

Construction Cost Estimation Quiz

Construction Cost Estimation Quiz

Assessment

Quiz

Construction

12th Grade

Practice Problem

Easy

Created by

Emmanuel Onimowo

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of a Bill of Quantities (BOQ)?

To determine the quality of construction materials

To provide an estimate of the project cost for contractors

To manage the scheduling of a construction project

To track project progress

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who is primarily responsible for preparing a Bill of Quantities (BOQ)?

Civil Engineers

Site Supervisors

Quantity Surveyors

Project Managers

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When calculating material costs, which factor should also be considered?

Interest rates

Employee wages

Taxes, delivery, and wastage

Equipment rental fees

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of tender documents?

To outline project scope, specifications, and requirements

To manage site safety regulations

To list the daily work schedules of labourers

To track project delays

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which is NOT a common cost-reporting technique?

Budget vs. actual reports

Cost breakdowns by category

Weather impact analysis

Trend analyses

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a key step in calculating the volume of an object?

Multiplying length, width, and height

Adding length and width

Subtracting width from length

Dividing length by height

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why are accurate cost estimates important in construction?

They help control expenses and prevent overruns

They reduce the need for labour

They eliminate the need for project planning

They ensure faster construction

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?