QUIZ - QS

QUIZ - QS

University

25 Qs

quiz-placeholder

Similar activities

RA 9514 - Fire Code of the Philippines

RA 9514 - Fire Code of the Philippines

University

21 Qs

Construction Materials UNIT 1

Construction Materials UNIT 1

University

25 Qs

BUILDING UTILITIES PART 1_PLUMBING

BUILDING UTILITIES PART 1_PLUMBING

University

30 Qs

CONSTRUCTION PRE-PLANNING QUIZ

CONSTRUCTION PRE-PLANNING QUIZ

University

20 Qs

BQS609 - Professional Practice

BQS609 - Professional Practice

University

25 Qs

*Profprac

*Profprac

University

25 Qs

LANDFILL LECTURE 5

LANDFILL LECTURE 5

University

20 Qs

HISTORY, THEORY AND PROFESSIONAL PRACTICE

HISTORY, THEORY AND PROFESSIONAL PRACTICE

University

30 Qs

QUIZ - QS

QUIZ - QS

Assessment

Quiz

Architecture

University

Medium

Created by

Ken Siy

Used 2+ times

FREE Resource

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 4 pts

Which of the following best describes a Measurement project cost?

The project cost is determined in advance, regardless of actual expenses

The contractor is paid based on actual work quantities measured on-site

The owner pays the contractor a fixed fee for supervision

The contract price includes both design and construction phases

2.

MULTIPLE CHOICE QUESTION

20 sec • 4 pts

Which participant is responsible for securing project funding and defining project requirements?

General Contractor

Design Team

Project Manager

Owner

3.

MULTIPLE CHOICE QUESTION

20 sec • 4 pts

Which construction participant is responsible for obtaining permits and ensuring code compliance?

Owner

Architect/Engineer

Project Manager

General Contractor

4.

MULTIPLE CHOICE QUESTION

20 sec • 4 pts

Which construction participant specializes in specific trades, such as electrical or plumbing work?

General Contractor

Subcontractor

Construction Manager

Architects

5.

MULTIPLE CHOICE QUESTION

20 sec • 4 pts

Who is typically responsible for quality control and ensuring that the work meets design specifications?

Design Team

Project Managers

General Contractor

Suppliers

6.

MULTIPLE CHOICE QUESTION

20 sec • 4 pts

In a Cost-Reimbursement project cost, how is the contractor paid?

A fixed total price for the entire project

According to unit rates for each task performed

Based on actual costs incurred plus a fee or percentage

A fixed price for labor and variable cost for materials

7.

MULTIPLE CHOICE QUESTION

20 sec • 4 pts

What is the main advantage of a Lump Sum project cost?

It allows flexibility in design change

It provides cost certainty for the owner

It is only used for large-scale projects

It does not require a detailed project scope

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?