OM, OR

OM, OR

Professional Development

19 Qs

quiz-placeholder

Similar activities

8th May - Junior Cert - Round 2

8th May - Junior Cert - Round 2

Professional Development

15 Qs

অনলাই কুইজ

অনলাই কুইজ

Professional Development

20 Qs

My Family’s name

My Family’s name

Professional Development

16 Qs

Toán đại 11

Toán đại 11

Professional Development

20 Qs

R Practice

R Practice

University - Professional Development

17 Qs

M1 Cat A

M1 Cat A

Professional Development

17 Qs

Maths and judo

Maths and judo

3rd Grade - Professional Development

15 Qs

KCS Shape & Space Quiz 2

KCS Shape & Space Quiz 2

KG - Professional Development

20 Qs

OM, OR

OM, OR

Assessment

Quiz

Mathematics

Professional Development

Practice Problem

Hard

Created by

Anne Pascual

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

19 questions

Show all answers

1.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

What is the type of objective function it the given problem?


An animal feed company must produce 200 kg of a mixture consisting of ingredients A and B daily. A costs Rs. 3 per kg and B costs Rs. 8 per kg. Not more than 80 kg of A can be used and at least 60 kg of B must be used.

2.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

The primal problem refers to the original optimization problem, while the _______ problem is derived from the primal problem. The _______ provides insights into the bounds on the objective function and helps in interpreting the economic meaning of constraints.

3.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

_____________ is used for optimization problems where some or all of the decision variables must take integer values, often applied in scenarios like scheduling, facility location, and resource allocation.

4.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

The _____________ is the longest sequence of dependent tasks in a project, determining the minimum time required to complete the project.

5.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

____________ is the established time required to perform a task or operation under normal working conditions, allowing for allowances for rest, delays, and interruptions. It is used to set benchmarks for productivity.

6.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

are a set of basic hand motions used to analyze work processes. Developed by Frank and Lillian Gilbreth, they help in breaking down tasks into fundamental movements to identify inefficiencies and suggest improvements.

7.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

____________ are methods used to determine the time required to perform a task based on the time needed for predefined basic motions. These systems provide standard time values for common motions used in industrial tasks, helping to improve accuracy and consistency in time measurement

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?