OM, OR

OM, OR

Professional Development

19 Qs

quiz-placeholder

Similar activities

Week 6 Review

Week 6 Review

Professional Development

20 Qs

RIDDLES

RIDDLES

Professional Development

15 Qs

Squares and Square Roots

Squares and Square Roots

7th Grade - Professional Development

20 Qs

ITF QUIZ

ITF QUIZ

12th Grade - Professional Development

14 Qs

ES & Technology Family Day

ES & Technology Family Day

Professional Development

17 Qs

Quizizz ағылшынша математика

Quizizz ағылшынша математика

Professional Development

20 Qs

Coordinate Plane Quiz

Coordinate Plane Quiz

Professional Development

15 Qs

Volume  of 3 D shapes

Volume of 3 D shapes

8th Grade - Professional Development

14 Qs

OM, OR

OM, OR

Assessment

Quiz

Mathematics

Professional Development

Practice Problem

Hard

Created by

Anne Pascual

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

19 questions

Show all answers

1.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

What is the type of objective function it the given problem?


An animal feed company must produce 200 kg of a mixture consisting of ingredients A and B daily. A costs Rs. 3 per kg and B costs Rs. 8 per kg. Not more than 80 kg of A can be used and at least 60 kg of B must be used.

2.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

The primal problem refers to the original optimization problem, while the _______ problem is derived from the primal problem. The _______ provides insights into the bounds on the objective function and helps in interpreting the economic meaning of constraints.

3.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

_____________ is used for optimization problems where some or all of the decision variables must take integer values, often applied in scenarios like scheduling, facility location, and resource allocation.

4.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

The _____________ is the longest sequence of dependent tasks in a project, determining the minimum time required to complete the project.

5.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

____________ is the established time required to perform a task or operation under normal working conditions, allowing for allowances for rest, delays, and interruptions. It is used to set benchmarks for productivity.

6.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

are a set of basic hand motions used to analyze work processes. Developed by Frank and Lillian Gilbreth, they help in breaking down tasks into fundamental movements to identify inefficiencies and suggest improvements.

7.

FILL IN THE BLANK QUESTION

20 sec • 1 pt

____________ are methods used to determine the time required to perform a task based on the time needed for predefined basic motions. These systems provide standard time values for common motions used in industrial tasks, helping to improve accuracy and consistency in time measurement

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?