Unit 106 - Revision Paper

Unit 106 - Revision Paper

Vocational training

20 Qs

quiz-placeholder

Similar activities

UNIT 202 Waste Management Learning Material

UNIT 202 Waste Management Learning Material

12th Grade

20 Qs

Đồ ăn

Đồ ăn

1st - 3rd Grade

16 Qs

EA S1Final #4 Revit

EA S1Final #4 Revit

9th - 12th Grade

20 Qs

Site Organizational Studies

Site Organizational Studies

University

20 Qs

WJEC Construction job roles

WJEC Construction job roles

10th - 11th Grade

15 Qs

Unit 104 - Site Preparation

Unit 104 - Site Preparation

9th - 12th Grade

16 Qs

Lecture 1 - MySMM & Specification Writing

Lecture 1 - MySMM & Specification Writing

University

15 Qs

Quiz BIM

Quiz BIM

12th Grade

15 Qs

Unit 106 - Revision Paper

Unit 106 - Revision Paper

Assessment

Quiz

Other

Vocational training

Hard

Created by

Plumbers Cymoedd

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which BIM dimension includes the construction sequencing? Select one.

3D

4D

5D

6D

2.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

What is soft landings? Select any that apply.

Soft landings is the inclusion of the soft landscape design, implementation and maintenance within the project plan.

Soft landings is a process for a gradual handover of a new building, where a period of professional aftercare by the project team is a contractual client requirement.

Soft landings is carried through from project inception, through design development and review, pre handover, initial aftercare, and for up to three years post-completion.

Soft landings is a non-proprietary data format for the publication of a subset of building information models.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is not part of the BIM life cycle?

Plan

Design

Analyse

Maintain

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where would you find a BIM protocol:

Within the 3D modelling data

Within the Precontract BIM Execution Plan

Within the Construction Contract

Within the Construction Operations Building Information Exchange (COBie)

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is a term used to describe 3D printing?

Additive Manufacturing (AM)

Computer Aided Manufacturing (CAM)

Asset Information Modelling (AIM)

Project Information Modelling (PIM)

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is a definition of AR?

A digital simulation that you can interact with

A model that can provide graphical information

A computer-simulated ‘enhancement’ of real life

Combines both Virtual and Augmented Reality

7.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which two of the following can be added to concrete to give it ‘self-healing’ properties?

Bio-degradable paste

Bacterial solution

Quartz crystals

Hemp fibres

Memory polymer tendons

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?