Phase 1 cold water end of unit mock test

Phase 1 cold water end of unit mock test

Vocational training

18 Qs

quiz-placeholder

Similar activities

Bpec Low Carbon Steel

Bpec Low Carbon Steel

KG - University

20 Qs

Pipes and Fittings, Plumbing Fixtures

Pipes and Fittings, Plumbing Fixtures

University

13 Qs

unit 113 powerpoint 3

unit 113 powerpoint 3

10th Grade

21 Qs

305 Cold water systems 3 Quiz

305 Cold water systems 3 Quiz

2nd Grade - University

18 Qs

305 Cold Water systems  2 Quiz

305 Cold Water systems 2 Quiz

2nd Grade

20 Qs

Level 2 Cold Water Plumbing Exam - Version 2

Level 2 Cold Water Plumbing Exam - Version 2

12th Grade - University

18 Qs

150589 Plumbing Science

150589 Plumbing Science

1st Grade

23 Qs

Phcc  Ch 8 : Square Roots

Phcc Ch 8 : Square Roots

KG - University

14 Qs

Phase 1 cold water end of unit mock test

Phase 1 cold water end of unit mock test

Assessment

Quiz

Construction

Vocational training

Medium

Created by

Luke Rock

Used 2+ times

FREE Resource

18 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum depth at which a water main service pipe should be laid at?

750mm

1250mm

1350mm

1750mm

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fluid category 1 represents:

Serious health risk

Significant health risk

Slight health risk

No health risk

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following water pipes connects the local main to the water undertaker’s stop valve?

Distribution pipe

Communication pipe

Feed pipe

Service pipe

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The plastic medium density supply pipe, which is coloured blue, is manufactured from which one of the following materials?

Polyethylene

Polystyrene

Polypropylene

Polybutylene

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is the minimum depth at which a water main service should be laid?

1350mm

1150mm

950mm

750mm

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following can affect the pressure and flow rates to the incoming main to a property?

Peak demand periods

The size of the CWSC in the loft

The square meter floor area of the property

How close the water meter is to the property

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Water which is from underground sources and has passed through sandstone will generally be classed as which type of water?

Very soft water

Soft water

Temp hard water

Permanently hard

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?