Hot Water - PPT 2 - System Upgrades

Hot Water - PPT 2 - System Upgrades

12th Grade

9 Qs

quiz-placeholder

Similar activities

Carry Out Concreting to Simple Forms

Carry Out Concreting to Simple Forms

12th Grade

9 Qs

Best Practices in Construction Management

Best Practices in Construction Management

12th Grade

10 Qs

Risk Assessment H&S Quizz

Risk Assessment H&S Quizz

12th Grade

10 Qs

Rainwater System Quiz

Rainwater System Quiz

12th Grade

14 Qs

Security Quiz

Security Quiz

12th Grade

10 Qs

Cold Water Systems Quiz 2.2-2.3

Cold Water Systems Quiz 2.2-2.3

12th Grade

10 Qs

Healthy and Safety Quiz

Healthy and Safety Quiz

12th Grade

10 Qs

unit 108 ppt 1 Knowledge check

unit 108 ppt 1 Knowledge check

12th Grade

13 Qs

Hot Water - PPT 2 - System Upgrades

Hot Water - PPT 2 - System Upgrades

Assessment

Quiz

Construction

12th Grade

Practice Problem

Medium

Created by

Adam Dreifuss

Used 5+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one disadvantage of the old gravity circulation system in plumbing?

Fast heat-up and recovery

Little or no control, leading to wastage of fuel

Small diameter pipes required

Highly insulated cylinder and pipework

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What size of pipes is required on primary circuits in old gravity systems?

15mm

22mm

28mm

35mm

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a characteristic of old gravity systems?

Efficient fuel usage

Poorly insulated cylinder and pipework

Quick heat-up and recovery

Small diameter pipes

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is required for hot water storage vessels if they are changed?

Minimum efficiency requirements

Maximum capacity standards

Basic safety checks

Standard installation guidelines

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is involved in the upgrading of controls in an old gravity system?

'C' Plan

'B' Plan

'A' Plan

'D' Plan

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should boilers meet if they are changed according to the new upgrade requirements?

Old efficiency standards

New SEDBUK ratings scheme

Minimum safety requirements

Maximum temperature limits

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of control upgrade is mentioned for the system?

Manual control

Fully pumped ('S'/'Y' or Pump Plan)

Semi-automatic control

Gravity-fed control

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who must certify the installations of the upgraded system?

Any available technician

A competent person

The homeowner

A government official

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done to all pipes connected to a hot water vessel?

Painted for protection

Insulated as per requirement

Left exposed for easy access

Covered with plastic