Hot Water - PPT 5 - Showers

Hot Water - PPT 5 - Showers

12th Grade

30 Qs

quiz-placeholder

Similar activities

Introduction to BIM

Introduction to BIM

12th Grade

25 Qs

Lean Construction and Technology Quiz

Lean Construction and Technology Quiz

12th Grade

25 Qs

NCCER Electrical 3 Module 1

NCCER Electrical 3 Module 1

University

25 Qs

UK ECONOMY

UK ECONOMY

12th Grade

25 Qs

PPT 2 - Central heating system principles

PPT 2 - Central heating system principles

12th Grade - University

28 Qs

Review Questions

Review Questions

9th - 12th Grade

34 Qs

Mathematics and Measurement Quiz

Mathematics and Measurement Quiz

9th - 12th Grade

35 Qs

welding final

welding final

9th - 12th Grade

25 Qs

Hot Water - PPT 5 - Showers

Hot Water - PPT 5 - Showers

Assessment

Quiz

Construction

12th Grade

Practice Problem

Hard

Created by

Adam Dreifuss

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a type of shower mixer valve?

Gravity mixer

Pressure valve

Thermal mixer

Rotary valve

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one classification of shower mixer valves?

Mains-fed/boosted mixer

Hydraulic mixer

Solar mixer

Pneumatic mixer

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of having the cold water feed to the cylinder higher than the cold for the shower in a cistern-fed/gravity mixer system?

To ensure the cold water runs out first

To ensure the hot water runs out first

To balance the water pressure

To reduce water temperature

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum head required for the shower mixer valve in a cistern-fed/gravity mixer system?

0.5m

1m

1.5m

2m

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the recommended pipe size before reducing to 15mm in a cistern-fed/gravity mixer system?

10mm

15mm

22mm

30mm

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is required for a cistern-fed/gravity mixer to function properly?

Unequal pressure

Equal pressure

High pressure

No pressure

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

From where are both the hot and cold water fed in a cistern-fed/gravity mixer?

Directly from the mains

From the CWSC

From a separate tank

From a boiler

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?