1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A cut through view of what a building looks like inside is called what?
A risk assessment
A specification
(Cross) sectional drawing
A plan
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What would happen if an operative did not understand a drawing prior to starting a task?
Incorrect dimensions or product
Correct dimensions or product
The job is unsafe
The site Manager will build the job
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which tool can be used to check that a return has been built correctly at 90 degrees to the wall?
A bolster chisel
A spirit level
A profile
A builders square
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How many blocks are needed for a wall 8800mm long?
15
20
10
17
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why should materials be placed at least 600mm from the work area?
To leave room for sitting and drinking tea
To make you work harder
To give you space to work and reduce trip hazards
To give you room to spill mortar
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which answer is the WRONG one?
What characteristics must a wall tie have?
It must let water drip down the cavity
It must be rust proof
It must be strong
It must be weak
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why do risk assessments state that gloves should be worn when mixing mortar?
Cement burns
Dermatitis
Skin irritation
All of these
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?