9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 3 pts

Media Image

What is the first step in building a pipeline?

Welding the pipes together

Surveying the route

Pumping water through the pipeline

Digging trenches

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Media Image

Workers use cranes to lift and place the pipes into the trenches.

True

False

Answer explanation

Media Image

The text mentions that cranes are used to carefully lift and place the pipes into the trenches.

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Media Image

Engineers test the pipeline by heating it up to high temperatures.

True

False

Answer explanation

Media Image

Engineers test the pipeline by pumping water through it at high pressure, not by heating it up.

4.

MULTIPLE CHOICE QUESTION

30 sec • 3 pts

Media Image

How deep are the trenches where the pipeline is placed?

2 meters

5 meters

1 meter

10 meters

5.

MULTIPLE CHOICE QUESTION

30 sec • 3 pts

Media Image

What do workers use to clear the route for the pipeline?

Cranes

Helicopters

Diggers

Bulldozers

6.

MULTIPLE CHOICE QUESTION

30 sec • 3 pts

Media Image

How do engineers test the strength of the pipeline?

By sending electricity through it

By pumping water through it at high pressure

By walking on it

By heating it up

7.

WORD CLOUD QUESTION

45 sec • Ungraded

Media Image

Name one of the professions or equipment from "Laying a pipeline"

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?