Hot Water - PPT 8 - Install hot water systems and components

Hot Water - PPT 8 - Install hot water systems and components

12th Grade

34 Qs

quiz-placeholder

Similar activities

12.1 Domestic Heating Systems Quiz

12.1 Domestic Heating Systems Quiz

12th Grade

37 Qs

Plumbing Level 1 Materials

Plumbing Level 1 Materials

12th Grade

35 Qs

Review Questions

Review Questions

9th - 12th Grade

34 Qs

Construction Industry Insights Quiz

Construction Industry Insights Quiz

12th Grade

30 Qs

Hot Water - PPT 8 - Install hot water systems and components

Hot Water - PPT 8 - Install hot water systems and components

Assessment

Quiz

Construction

12th Grade

Medium

Created by

Adam Dreifuss

Used 2+ times

FREE Resource

34 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which British Standard covers the installation of hot water pipework?

BS EN 1057

British Standard 8558

BS EN 1234

British Standard 9001

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which British Standard covers plumbing materials, like copper tubes and plastic pipework?

BS EN 1057

British Standard 8558

BS EN 1234

British Standard 9001

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What materials are usually used for hot water systems to prevent contamination?

PVC pipes

Copper tubes and polybutylene pipes

Steel pipes

Aluminum tubes

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum temperature hot water should reach in these systems?

100°C

95°C

90°C

85°C

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The pipework should withstand how many times the normal operating pressure?

One time

One and a half times

Two times

Three times

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a key consideration when installing hot and cold water pipework side by side?

Ensuring the hot water pipework is above the cold water pipework

Ensuring the cold water installation is not adversely affected by the hot water pipework

Ensuring both pipeworks are of the same material

Ensuring the hot water pipework is insulated

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done before pressure testing open-vented cylinders?

Increase the pressure gradually

Ensure the cylinder is full of water

Ensure the maximum pressure the cylinder can withstand is not exceeded

Ensure the cylinder is empty

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?