Site and Building Layout Study Guide

Site and Building Layout Study Guide

9th Grade

27 Qs

quiz-placeholder

Similar activities

Foundation Plumbing Unit 101 ppt4

Foundation Plumbing Unit 101 ppt4

11th Grade

24 Qs

Understanding Stress and Beams

Understanding Stress and Beams

University

25 Qs

PPT 3 - Central heating systems installed in domestic dwellings

PPT 3 - Central heating systems installed in domestic dwellings

12th Grade - University

25 Qs

KONSTRUKSI JALAN DAN JEMBATAN 2025

KONSTRUKSI JALAN DAN JEMBATAN 2025

11th Grade

25 Qs

MTL1 H&S Learner Outcome 6

MTL1 H&S Learner Outcome 6

11th Grade

28 Qs

EPA Review -- CORE pt 1 (English)

EPA Review -- CORE pt 1 (English)

12th Grade

30 Qs

Safety 9-18-25

Safety 9-18-25

9th Grade - University

22 Qs

Unit 202 revision

Unit 202 revision

12th Grade

23 Qs

Site and Building Layout Study Guide

Site and Building Layout Study Guide

Assessment

Quiz

Construction

9th Grade

Practice Problem

Easy

Created by

Josh Hall

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

27 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Construction drawings and documents used by builders represent a legal agreement between who? Pg 148

Builders and Architects

Owner and Contractor

Builders and Engineers

Owner and Suppliers

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A plumb wall is perfectly _______. Pg 149

vertical

horizontal

diagonal

curved

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which two construction drawings or plans are primarily used when laying out a site or building? Pg 150

Architectural and CIvil

Elevation and Section

Foundation Plan and Roof Plan

Electrical Plan and Plumbing Plan

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who should perform the layout activities that establish legal property lines or boundaries? Pg 150

Registered Surveyors

Architects

Registered Engineers

Contractors

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When no permanent object is available as a primary control point marker a concrete ______ can be used. Pg 152

monument

footing

stake

museum

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Site plans include both man-made features and _______ features. Pg 153

natural

artificial

synthetic

constructed

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A setback is the distance between which 2 lines?

Property line and building line

Street line and property line

Building line and street line

Fence line and property line

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?