PROJECT TEAM BUILDING & RIBA

PROJECT TEAM BUILDING & RIBA

Vocational training

15 Qs

quiz-placeholder

Similar activities

Stairs Construction

Stairs Construction

9th - 12th Grade

14 Qs

Understanding SDS Drill Bits and Screws

Understanding SDS Drill Bits and Screws

KG - University

10 Qs

¿Qué aprendimos sobre el cuidado del  ambiente?

¿Qué aprendimos sobre el cuidado del ambiente?

8th Grade

16 Qs

General Shop/Lab Safety Rules Quiz

General Shop/Lab Safety Rules Quiz

9th Grade

14 Qs

15 Basic mechanics (2365) (A)

15 Basic mechanics (2365) (A)

KG - University

20 Qs

Terminologie d'escalier

Terminologie d'escalier

Professional Development

10 Qs

Video: Instalación de cámaras de seguridad CCTV con NVR PoE

Video: Instalación de cámaras de seguridad CCTV con NVR PoE

11th Grade - University

11 Qs

Unit 122/124 Scratch/Floating Coats

Unit 122/124 Scratch/Floating Coats

12th Grade

20 Qs

PROJECT TEAM BUILDING & RIBA

PROJECT TEAM BUILDING & RIBA

Assessment

Quiz

Construction

Vocational training

Practice Problem

Easy

Created by

Bazz Jill

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following people is NOT part of the project building team?

Client

Designer

Fireman

Specialist Consultant

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is included in the public sector agencies?

  Water Department

Gas Department

Telephone Department

Road Department

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who are the members of the Design team?

Architect, Engineer, Legal Advisor

Architect, Engineer, Technology Specialist

Architect, Contractor, Engineer

Architect, Project Manager, Engineer

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the Project Building Team chart, who does the client make a direct contact with?

Contractor

Sub – Contractor

Project Manager

None of the above

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following statements below defines the role of an Architect?

Attend site meeting and discuss delays and other problems,

which may be critical.

Calculation of sizes of units/structural components especially

for local authority approval.

Recommending the selection and appointments of designers

and other consultants.

Plans the works whenever any unforeseen events frustrate

the programme.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following statements defines the role of the Electricity Department?

Process application for meter connections

Involve in the inspections of the completed building

Diversion of existing pipes in urban houses

Installing and maintaining electricity meter

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does “R.I.B.A” stand for in R.I.B.A Plan of Work?

Royal Institute of Build Architects

Royal Institute of Basic Architects

Royal Institute of Brunei Architects

Royal Institute of British Architects

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?