Day 2 Knowledge Check

Day 2 Knowledge Check

Professional Development

20 Qs

quiz-placeholder

Similar activities

POST TEST TRAINING BIQ & ABNORMALITY

POST TEST TRAINING BIQ & ABNORMALITY

Professional Development

20 Qs

Assessment in Learning 1 (Testing)

Assessment in Learning 1 (Testing)

Professional Development

15 Qs

Triển khai 5S và cập nhật kiến thức Kiểm soát nhiễm khuẩn

Triển khai 5S và cập nhật kiến thức Kiểm soát nhiễm khuẩn

Professional Development

20 Qs

EDF QUIZ-1

EDF QUIZ-1

Professional Development

20 Qs

Lean Manufacturing Quiz

Lean Manufacturing Quiz

Professional Development

20 Qs

HAND TOOL TOP 20

HAND TOOL TOP 20

Professional Development

15 Qs

Photoshop tools

Photoshop tools

6th Grade - Professional Development

16 Qs

Training Basic 5S

Training Basic 5S

Professional Development

15 Qs

Day 2 Knowledge Check

Day 2 Knowledge Check

Assessment

Quiz

Education

Professional Development

Medium

Created by

Joseph Volpe

Used 3+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many product lines do we have

1

5

6

Varies

Answer explanation

Media Image

Ultra Low Temperature Freezers

Laboratory Refrigerator and Freezers

Temperature Control Process Chiller

Temperature Control Bath

Lab Line

The Fabrication Line is not a production line, instead it manufactures parts for use in these 5 product lines.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must be done before using any tool or machine?

Ask if you can use

Look for tripping hazards

Clean the tool/ machine

Pre-Use Inspection

Answer explanation

Before using any tool or machine, a Pre-Use Inspection is essential to ensure it is safe and functioning properly. This step helps identify any potential hazards or issues that could lead to accidents.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When using a calibrated tool, what must the operator do before use (this is part of the pre-use inspection)

Pre- Use Inspection

Confirm the date the tool is being use is in between the calibration dates.

Ensure the tool is in the locked position

Review the SOE for tool use with your Supervisor or Flow Lead.

Answer explanation

Before using a calibrated tool, the operator must confirm that the date of use falls within the calibration dates to ensure accuracy and compliance. This is crucial for maintaining tool reliability.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the two parts of a pop rivet?

Shank and a Mandrel

Its called a pop rivet because the sound the head makes when it snaps off!

A pop rivet only has one part, the rivet.

Pnuematic

Answer explanation

A pop rivet consists of two main parts: the shank, which is the body of the rivet, and the mandrel, which is the pin that holds the rivet in place until it is snapped off. This makes "Shank and a Mandrel" the correct answer.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Dale and Brian are exploring Lean Manufacturing principles in class. They come across a fascinating inventory scheduling system that keeps vendor managed parts fully stocked. Can you help them identify this system?

Pulse

Parts ordering Cards

Kanban

5S

Answer explanation

The Kanban system is a visual inventory management method that ensures parts are restocked as needed, making it ideal for vendor-managed inventory. It helps maintain a continuous flow of materials, aligning with Lean Manufacturing principles.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Imagine you're a part of a dynamic team with Lincoln and Joe. When is the best time to order new parts to keep the workflow smooth and efficient?

As soon as the bin is empty.

Before the end of your shift.

When your supervisor asks you.

Shortly before you run out of parts.

Answer explanation

Ordering new parts as soon as the bin is empty ensures that you maintain a continuous workflow without delays. Waiting until later can lead to shortages and interruptions in the process.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When do we practice 5S?

Every hour on the hour

It just needs to be done once a week

This is a one time event.

Before the end of each shift.

Answer explanation

5S should be practiced before the end of each shift to maintain organization and efficiency in the workplace. This ensures that the workspace is clean and orderly for the next shift, promoting a continuous improvement culture.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?