Search Header Logo

Plastering a Stud Wall Quiz

Authored by Mitchell Roe

Construction

9th Grade

Used 1+ times

Plastering a Stud Wall Quiz
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in preparing a stud wall for plastering?

Applying the first coat of plaster

Cleaning and removing any dust or debris

Painting the wall

Installing insulation

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which tool is essential for mixing plaster?

Trowel

Hawk

Drill with a mixing paddle

Spirit level

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of applying a first coat of plaster?

To add colour to the wall

To create a smooth finish

To provide a base layer for the final coat

To waterproof the wall

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How thick should the first coat of plaster be applied?

1 mm

3 mm

6 mm

10 mm

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which tool is used to smooth the plaster after application?

Sandpaper

Trowel

Paintbrush

Roller

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the recommended drying time for the first coat of plaster before applying the second coat?

30 minutes

1 hour

2 hours

24 hours

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a hawk in plastering?

To mix plaster

To hold plaster while applying it to the wall

To measure the wall

To smooth the plaster

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?