Risk Management in Architecture

Risk Management in Architecture

University

15 Qs

quiz-placeholder

Similar activities

Quiz 04: Transportation Planning

Quiz 04: Transportation Planning

University

15 Qs

Disaster Management- Unit-1

Disaster Management- Unit-1

University

20 Qs

LANDFILL LECTURE 5

LANDFILL LECTURE 5

University

20 Qs

L: SET 1

L: SET 1

University

10 Qs

ARCHITECTURAL Quiz

ARCHITECTURAL Quiz

1st Grade - University

10 Qs

Building Information Modelling Quiz

Building Information Modelling Quiz

University

14 Qs

CA 4.2 READING Ernesto. N. Rogers. Aprendiendo de la historia

CA 4.2 READING Ernesto. N. Rogers. Aprendiendo de la historia

University

20 Qs

Water Management in Rock Cut Monasteries of Western India

Water Management in Rock Cut Monasteries of Western India

University

10 Qs

Risk Management in Architecture

Risk Management in Architecture

Assessment

Quiz

Architecture

University

Medium

Created by

architect shahrukh

Used 1+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of risk assessment techniques in architecture?

To enhance aesthetic appeal in buildings.

To identify and mitigate potential risks in architectural design.

To increase construction costs.

To comply with local building codes.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a common method for assessing risks in architectural projects?

Cost-benefit analysis

Stakeholder interviews

Design review meetings

Risk assessment workshop

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in disaster preparedness planning for architectural projects?

Conduct a risk assessment.

Hire a project manager.

Select construction materials.

Create a budget plan.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which regulatory body is typically responsible for building codes and safety regulations?

Local or state building departments

Environmental Protection Agency

National Highway Traffic Safety Administration

Federal Aviation Administration

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a key component of sustainability in architecture related to risk management?

Risk assessment and mitigation of environmental impacts.

Using non-renewable materials

Incorporating more decorative elements

Maximizing energy consumption

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How can project management risks be minimized during the design phase?

Conduct thorough stakeholder analysis and establish clear communication channels.

Rely on outdated project management tools

Ignore feedback from stakeholders during design

Focus solely on budget constraints

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a type of risk assessment technique?

quantitative analysis

qualitative analysis

random guessing

expert judgment

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?