Search Header Logo

Risk Management in Architecture

Authored by architect shahrukh

Architecture

University

Used 1+ times

Risk Management in Architecture
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of risk assessment techniques in architecture?

To enhance aesthetic appeal in buildings.

To identify and mitigate potential risks in architectural design.

To increase construction costs.

To comply with local building codes.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a common method for assessing risks in architectural projects?

Cost-benefit analysis

Stakeholder interviews

Design review meetings

Risk assessment workshop

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in disaster preparedness planning for architectural projects?

Conduct a risk assessment.

Hire a project manager.

Select construction materials.

Create a budget plan.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which regulatory body is typically responsible for building codes and safety regulations?

Local or state building departments

Environmental Protection Agency

National Highway Traffic Safety Administration

Federal Aviation Administration

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a key component of sustainability in architecture related to risk management?

Risk assessment and mitigation of environmental impacts.

Using non-renewable materials

Incorporating more decorative elements

Maximizing energy consumption

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How can project management risks be minimized during the design phase?

Conduct thorough stakeholder analysis and establish clear communication channels.

Rely on outdated project management tools

Ignore feedback from stakeholders during design

Focus solely on budget constraints

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a type of risk assessment technique?

quantitative analysis

qualitative analysis

random guessing

expert judgment

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?