1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the correct sequence when following the safe isolation procedure?

1 Lock off and secure key

2 Seek permission from client

3 Test for dead

4 Prove voltage indicators on known source

2-4-1-3

1-2-3-4

2-1-4-3

4-1-2-3

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What would be the most appropriate method to isolate a lighting circuit prior to fault finding?

Remove DNO fuse

Turn off a light switch

Remove BS 1362 fuse from FCU

Lock off CB

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which method would provide local isolation to a 5kW three-phase motor?

Lock off main switch at DB

Lock off CB at DB

Remove BS 88-2 fuse from DNO supply

Lock off Motor Isolator

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Turning off a dimmer switch is an acceptable means of isolating a light prior to fault finding?

True

False

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Removing a fuse is an acceptable means of isolating a circuit prior to fault finding?

True

False

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?