Practice Exam

Practice Exam

9th Grade

10 Qs

quiz-placeholder

Similar activities

Demolition Quiz

Demolition Quiz

9th Grade

11 Qs

Document Analysis Quiz

Document Analysis Quiz

9th Grade

12 Qs

Construction for Machine Operation Safety Test 2024

Construction for Machine Operation Safety Test 2024

9th - 12th Grade

13 Qs

Planer Safety Test - Test #2

Planer Safety Test - Test #2

9th Grade - University

13 Qs

Jointer Safety Test - Test #3

Jointer Safety Test - Test #3

9th - 12th Grade

13 Qs

Electrical Technology NCCER (11th Edition) Module 3 Review

Electrical Technology NCCER (11th Edition) Module 3 Review

9th - 12th Grade

15 Qs

SSC Topic C388

SSC Topic C388

9th Grade

10 Qs

Ausan, BTVTED CT

Ausan, BTVTED CT

3rd Grade - University

10 Qs

Practice Exam

Practice Exam

Assessment

Quiz

Construction

9th Grade

Medium

Created by

Yolande Cole

Used 2+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

The total number of on-the-job learning hours for a typical electrical apprentice program is _____

9,000

10,000

4,000

8,000

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If you see a safety violation at your jobsite, you should _____

assume it is okay if no one has been injured

ignore it unless it affects you directly

make a mental note to avoid the area in future

report it to your supervisor

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A residential wiring system typically uses _____

tray cable

nonmetallic-sheathed cable

flat conductor cable

medium-voltage cable

4.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Minimum standards for apprenticeship training programs are established by _____

NCCER

DOL

the employer

OSHA

5.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which of the following is true about tardiness and absenteeism?

If you must be absent, call in early so your employer can find a replacement.

If you are not being paid, your absence does not cost the company anything.

It is okay to be a little late for work as long as you make up the time.

It is never acceptable to be absent, even when you are contagious.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A task such as motor starter repair would most likely be done by a(n) _____

electrical maintenance technician

commercial electrician

residential electrician

electrical remodeling contractor

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Panelboards in residential buildings are typically installed during _____.

trim-out

planning

rough-in

service installation

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?