Practice Exam

Practice Exam

9th Grade

10 Qs

quiz-placeholder

Similar activities

Electrical services and public health

Electrical services and public health

9th Grade

6 Qs

Quizziz #8 11/1/24 Foundations of Construction - PX Mr.Weber

Quizziz #8 11/1/24 Foundations of Construction - PX Mr.Weber

9th Grade

15 Qs

AC1.1 The Sector - Buildings

AC1.1 The Sector - Buildings

9th Grade

9 Qs

Architectural Drawing Concepts Quiz

Architectural Drawing Concepts Quiz

9th - 12th Grade

11 Qs

Document Analysis Quiz

Document Analysis Quiz

9th Grade

12 Qs

Jointer Safety Test - Test #3

Jointer Safety Test - Test #3

9th - 12th Grade

13 Qs

Construction for Machine Operation Safety Test 2024

Construction for Machine Operation Safety Test 2024

9th - 12th Grade

13 Qs

Demolition Quiz

Demolition Quiz

9th Grade

11 Qs

Practice Exam

Practice Exam

Assessment

Quiz

Construction

9th Grade

Medium

Created by

Yolande Cole

Used 2+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

The total number of on-the-job learning hours for a typical electrical apprentice program is _____

9,000

10,000

4,000

8,000

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If you see a safety violation at your jobsite, you should _____

assume it is okay if no one has been injured

ignore it unless it affects you directly

make a mental note to avoid the area in future

report it to your supervisor

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A residential wiring system typically uses _____

tray cable

nonmetallic-sheathed cable

flat conductor cable

medium-voltage cable

4.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Minimum standards for apprenticeship training programs are established by _____

NCCER

DOL

the employer

OSHA

5.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which of the following is true about tardiness and absenteeism?

If you must be absent, call in early so your employer can find a replacement.

If you are not being paid, your absence does not cost the company anything.

It is okay to be a little late for work as long as you make up the time.

It is never acceptable to be absent, even when you are contagious.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A task such as motor starter repair would most likely be done by a(n) _____

electrical maintenance technician

commercial electrician

residential electrician

electrical remodeling contractor

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Panelboards in residential buildings are typically installed during _____.

trim-out

planning

rough-in

service installation

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?