AS-T12-Software development

AS-T12-Software development

11th Grade

•

37 Qs

quiz-placeholder

Similar activities

Excel

Excel

1st Grade - University

•

40 Qs

Pemodelan Perangkat Lunak

Pemodelan Perangkat Lunak

11th - 12th Grade

•

40 Qs

Soal Sumatif 1_v2 - HTML - Fase F

Soal Sumatif 1_v2 - HTML - Fase F

11th Grade

•

40 Qs

Sistema Operativo

Sistema Operativo

8th Grade - University

•

40 Qs

1 teori kejuruan TKJ

1 teori kejuruan TKJ

10th - 12th Grade

•

40 Qs

Programacion Vb (11)

Programacion Vb (11)

11th Grade

•

35 Qs

AP CSP Unit 1

AP CSP Unit 1

9th - 12th Grade

•

40 Qs

Evaluación Ruta Innovación Medio

Evaluación Ruta Innovación Medio

11th Grade

•

40 Qs

AS-T12-Software development

AS-T12-Software development

Assessment

Quiz

•

Computers

•

11th Grade

•

Practice Problem

•

Hard

Created by

Phương Nguyễn

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

37 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

checks if program performs as needed by customers before sign off; criteria is set and end user feedback is used to ensure criteria is met

acceptance testing

alpha testing

beta testing

white box testing

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

final round of testing;

users test under realistic conditions and feedback obtained;

checks if program meets requirements and performs as it should, problems reported to developer and corrected

acceptance testing

alpha testing

beta testing

white box testing

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

an individually tested module is joined to one program and tested to make sure modules interact correctly

acceptance testing

alpha testing

white box testing

integration testing

stub testing

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

using a simple module, written to replace each subroutine, has simple output to show that a call is made; used when the actual module is not completed

acceptance testing

alpha testing

white box testing

integration testing

stub testing

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

test where code is reviewed carefully by developers peers, managers, team members;

used to gather useful feedback to further develop code

acceptance testing

alpha testing

walkthrough testing

white box testing

dry run testing

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

code is manually traced, value of variable is manually followed to check if it was used and updated as expected;

used to identify logic errors but not execution errors

acceptance testing

alpha testing

walkthrough testing

white box testing

dry run testing

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

tests every path and every line of code using suitable test data;

tester views code

acceptance testing

blackbox testing

walkthrough testing

whitebox testing

dry run testing

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?