Search Header Logo

4th quarter Grade 8 Computer System Servicing Quiz

Authored by ian lastimosa

Instructional Technology

6th Grade

Used 16+ times

4th quarter Grade 8 Computer System Servicing Quiz
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

46 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following refers to work instruction?

A tool provided to help someone do a job correctly.

A list of tasks to be completed.

A report on completed tasks.

A summary of company goals.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What distinguishes active components from passive components in electronic circuits?

Active components amplify and generate electricity, while passive components can only accept energy.

Active components store energy, while passive components dissipate energy.

Active components are used in DC circuits, while passive components are used in AC circuits.

Active components are larger in size compared to passive components.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT an active component?

Transistor

Battery

Cathode ray tube (CRT)

Inductor

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary function of a resistor in an electrical circuit?

To amplify electrical signals

To store electrical energy

To block DC while allowing AC to pass through

To reduce current flow and adjust signal speeds

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the function of an inductor in an electrical circuit?

To store energy in the form of a magnetic field

To amplify electrical signals

To block AC while allowing DC to pass through

To increase the voltage of electrical signals

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which consulting approach involves working with a panel of experts and those identified as needing to be consulted?

Condescending consulting approach

Submissive consulting approach

Collaborative consulting approach

Planning the Work/Working the Plan

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which phase of the work coordination process involves defining desirable results, choosing who will do what, and reaching an agreement on design, expense, scheduling, and transparency?

Making First Contact/Entry

Establishing the Relationship

Problem Finding

Planning the Work/Working the Plan

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?