CHAPTER 3(NPCP)

CHAPTER 3(NPCP)

Professional Development

10 Qs

quiz-placeholder

Similar activities

Геодезия

Геодезия

Professional Development

10 Qs

Quiz sobre Interruptores Automáticos y Protección Eléctrica

Quiz sobre Interruptores Automáticos y Protección Eléctrica

Professional Development

14 Qs

October Sales Meeting Quiz

October Sales Meeting Quiz

Professional Development

10 Qs

SOCIALIZACION PIYE MES DE MAYO BRASSIA

SOCIALIZACION PIYE MES DE MAYO BRASSIA

Professional Development

8 Qs

Project Management (Pre-Test)

Project Management (Pre-Test)

Professional Development

6 Qs

Power Delivery System Quiz

Power Delivery System Quiz

Professional Development

10 Qs

Evaluasi Materi SUPA

Evaluasi Materi SUPA

Professional Development

10 Qs

Formulario plan de emergencia

Formulario plan de emergencia

Professional Development

10 Qs

CHAPTER 3(NPCP)

CHAPTER 3(NPCP)

Assessment

Quiz

Construction

Professional Development

Practice Problem

Medium

Created by

Ana Carvajal

Used 4+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a common reason for prohibiting side-inlet quarter bends in drainage systems?

A) They are too expensive to manufacture


B) They do not provide enough slope for proper drainage

C) They can cause waste backups and clogging

D) They are only allowed in residential buildings

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary reason for reaming the burred ends of pipes?

A) To increase water pressure


B) To prevent turbulence and clogging

C) To reduce the cost of installation

D) To strengthen the pipe material

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

n an interior lot, when a rear building cannot have its own sewer line, under what condition can it connect to the front building's drain?

A) Only if the front building’s drain size is adequate for both buildings

B) If the rear building is taller than the front building

C) Only if a pump system is used

D) If the rear building has a direct connection to the city sewer

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why are running thread fittings prohibited in drainage systems?


A) They create weak joints prone to leakage

B) They are too expensive to install

C) They allow excessive water pressure

D) They require specialized tools to install

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which is an approved method for sealing an unused opening in a drainage system?

A) Covering it with tape

B) Using a rubber stopper

C) Permanently plugging or capping it

D) Leaving it open for ventilation

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following drainage fittings is prohibited?

A) 45-degree elbow

B) Double hub fitting in a vertical position

C) Sanitary tee used in a vertical stack

D) Neoprene gasket with stainless steel band

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the required slope for pipes with a diameter less than 102mm?




A) 5mm/m or 0.5%

B) 10mm/m or 1%

C) 20mm/m or 2%

D) 25mm/m or 2.5%

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?