Phase 1 sanitation systems mock test

Phase 1 sanitation systems mock test

Vocational training

20 Qs

quiz-placeholder

Similar activities

307 Central heating systems 1 Quiz

307 Central heating systems 1 Quiz

2nd Grade - University

20 Qs

306 hot water systems 1 Quiz

306 hot water systems 1 Quiz

2nd Grade - University

20 Qs

PPT 3 - Pipework & Circulation COL

PPT 3 - Pipework & Circulation COL

12th Grade - University

15 Qs

Drainage Quiz 2

Drainage Quiz 2

12th Grade - University

24 Qs

309 Sanitation System 2 Quiz

309 Sanitation System 2 Quiz

2nd Grade

20 Qs

GMJ 6035 Drainage - stacks and below ground systems

GMJ 6035 Drainage - stacks and below ground systems

KG - University

18 Qs

Central heating systems 2025

Central heating systems 2025

KG - University

18 Qs

Bpec Level 1 Key features of domestic plumbing systems Part 1

Bpec Level 1 Key features of domestic plumbing systems Part 1

KG - University

22 Qs

Phase 1 sanitation systems mock test

Phase 1 sanitation systems mock test

Assessment

Quiz

Construction

Vocational training

Medium

Created by

Luke Rock

Used 6+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where are the statutory requirements for the installation of drainage systems?

BS 6700

BS EN 12056

Building regulations

WRAS

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Identify this type of system

Primary ventilated stack

Secondary ventilated

Ventilated discharge branch

Stube stack

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a discharge branch has a gradient of 18mm per metre and the branch is 3 metres in length, what will the vertical drop distance be?

54mm

18mm

36mm

72mm

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

 

What is the purpose of the component shown below, when installed at the base of the stack?

To prevent evaporation

To prevent backflow

To prevent expansion

To prevent compression

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The maximum recommended length of a discharge pipe from a bath connected to a primary ventilated stack is:

3m

4m

5m

6m

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the recommended termination, as per building regulations, for a soil stack inside a building?

Open ended

Cowl

Domical cage

Air admittance valve

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum sized waste that is allowed to be fitted to a wash basin?

32mm

40mm

50mm

100mm

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?