Technical Vocabulary QUIZ #5

Technical Vocabulary QUIZ #5

9th Grade

20 Qs

quiz-placeholder

Similar activities

CORE Module 1 Build Your Future Trade Terms (20)

CORE Module 1 Build Your Future Trade Terms (20)

9th - 12th Grade

20 Qs

Banking

Banking

9th - 12th Grade

16 Qs

Intro to Python Project Stem Unit 8 Vocab Test

Intro to Python Project Stem Unit 8 Vocab Test

9th - 12th Grade

18 Qs

TECHNOLOGY PROBLEM SOLVING

TECHNOLOGY PROBLEM SOLVING

8th Grade - University

15 Qs

Sanding and Sandpaper

Sanding and Sandpaper

9th - 12th Grade

21 Qs

IED Unit 1 Key Terms

IED Unit 1 Key Terms

9th - 12th Grade

20 Qs

Quiz Hotel - FIA

Quiz Hotel - FIA

1st - 12th Grade

23 Qs

1.1 Engineering as a Discipline Vocabulary TEST

1.1 Engineering as a Discipline Vocabulary TEST

9th - 10th Grade

16 Qs

Technical Vocabulary QUIZ #5

Technical Vocabulary QUIZ #5

Assessment

Quiz

Instructional Technology

9th Grade

Easy

Created by

Dwayne Dyke

Used 4+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The definition of 'Collaboration' is:

Working independently without any interaction.

A process where two or more people or organizations work together to achieve common goals.

A method of competition between individuals or groups.

A solitary activity with no external input.

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

What is the definition of 'Active Listening'?

A communication technique that involves giving free and undivided attention to the speaker.

A method of passive hearing without engaging with the speaker.

A way to interrupt the speaker to provide immediate feedback.

A technique to ignore the speaker and focus on personal thoughts.

3.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

'Concrete' is defined as:

A building material made from a mixture of broken stone or gravel, sand, cement, and water

A type of metal used in construction

A natural stone used for sculptures

A synthetic plastic material

4.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Estimating costs is the process of:

determining the budget for a project

analyzing the risks involved in a project

scheduling the project timeline

allocating resources to a project

5.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The R-value is a measure of what property in materials?

Thermal resistance

Electrical conductivity

Density

Flexibility

6.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

What is the definition of 'Heat Loss'?

The transfer of thermal energy from a warmer object to a cooler one

The process of gaining heat from the environment

The conversion of heat energy into mechanical energy

The absorption of heat by a material

7.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

What is the definition of 'U-factor'?

A measure of thermal transmittance

A type of insulation material

A unit of energy consumption

A method of heat retention

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?