Software Risks and Identification, Reengineering

Software Risks and Identification, Reengineering

University

45 Qs

quiz-placeholder

Similar activities

RUTS Technology

RUTS Technology

9th Grade - Professional Development

50 Qs

LONG QUIZ FAT 111

LONG QUIZ FAT 111

University

49 Qs

SINH 2

SINH 2

12th Grade - University

50 Qs

Electrical Christmas

Electrical Christmas

University

40 Qs

UTS Pembelajaran Digital

UTS Pembelajaran Digital

University

40 Qs

Indian Economy - 4

Indian Economy - 4

University

42 Qs

2020 PAS PISAV XII TAV

2020 PAS PISAV XII TAV

University

40 Qs

LÝ 1

LÝ 1

12th Grade - University

46 Qs

Software Risks and Identification, Reengineering

Software Risks and Identification, Reengineering

Assessment

Quiz

Instructional Technology

University

Practice Problem

Medium

Created by

Bit Ryan

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

45 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. What all has to be identified as per risk identification?

a) Threats

b) Vulnerabilities

c) Consequences

d) All of the mentioned

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2. Which one is not a risk management activity?

a) Risk assessment

b) Risk generation

c) Risk control

d) None of the mentioned

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3. What is the product of the probability of incurring a loss due to the risk and the potential magnitude of that loss?

a) Risk exposure

b) Risk prioritization

c) Risk analysis

d) All of the mentioned

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

4. What threatens the quality and timeliness of the software to be produced?

a) Known risks

b) Business risks

c) Project risks

d) Technical risks

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

5. What threatens the viability of the software to be built?

a) Known risks

b) Business risks

c) Project risks

d) Technical risks

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6. Which of the following is not a business risk?

a) building an excellent product or system that no one really wants

b) losing the support of senior management due to a change in focus or change in people

c) lack of documented requirements or software scope

d) losing budgetary or personnel commitment

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

7. Which of the following is a systematic attempt to specify threats to the project plan?

a) Risk identification

b) Performance risk

c) Support risk

d) Risk projection

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?