Transformation plan

Transformation plan

Professional Development

5 Qs

quiz-placeholder

Similar activities

QUIZZIS TERMOZIPA

QUIZZIS TERMOZIPA

Professional Development

9 Qs

QUIZZIS PARQUES FOTOVOLTAICOS

QUIZZIS PARQUES FOTOVOLTAICOS

Professional Development

10 Qs

Fleet Movement Sequence Concept

Fleet Movement Sequence Concept

Professional Development

5 Qs

Transformation plan

Transformation plan

Assessment

Quiz

Engineering

Professional Development

Hard

Created by

Moza AlShidi

FREE Resource

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. What is the percentage scope of piping assets covered in the 2025 plan?

50%

100%

30%

75%

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a requirement for the tank RBI assessment?

GE-APM Upgrade to API 579

Pipeline Inspection Procedure

GE-APM Upgrade to API 581

Structural Integrity Module

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the expected number of Relief Valves (RVs) to be assessed?

1,800

18,000

180

800

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of personnel is primarily responsible for gathering design and process data across assets in 2025?

RBI Engineer

Contract Inspector

Technical Clerk

Operator

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following assets is listed as outside the RBI transformation scope?

Boilers

Dead legs

Tanks

Cross-country pipelines