Phase 1 central heating mock test

Phase 1 central heating mock test

Vocational training

16 Qs

quiz-placeholder

Similar activities

Plumbing Materials: Understanding Radiator Components

Plumbing Materials: Understanding Radiator Components

KG - University

14 Qs

heatingtwo

heatingtwo

Professional Development

19 Qs

PPT 3 - Pipework & Circulation COL

PPT 3 - Pipework & Circulation COL

12th Grade - University

15 Qs

306 Hot water systems 3 Quiz

306 Hot water systems 3 Quiz

2nd Grade - University

18 Qs

Bpec Environmental 1

Bpec Environmental 1

KG - University

20 Qs

GMJ 8202 level 3 central heating quiz 1

GMJ 8202 level 3 central heating quiz 1

KG - University

20 Qs

307 Central heating systems 1 Quiz

307 Central heating systems 1 Quiz

2nd Grade - University

20 Qs

Central heating-Plumbing revision quiz 3

Central heating-Plumbing revision quiz 3

KG - University

21 Qs

Phase 1 central heating mock test

Phase 1 central heating mock test

Assessment

Quiz

Construction

Vocational training

Medium

Created by

Luke Rock

Used 3+ times

FREE Resource

16 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What heating system uses a difference in the density of water to circulate heat to a hot water cylinder?

Y Plan

Gravity fed

S Plan +

Hypocaust

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The conservation of fuel and energy is covered by which approved document?

P

M

H

L

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main purpose of a central heating system?

To heat up the core of the building

To provide thermal comfort

To supply heating to a single room

To provide heat to a number of properties

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the highest point of a vented heating system?

Expansion vessel

F&E cistern

Cold feed isolation valve

Automatic air vent

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary function of the open vent on a heating system?

To allow the system to pressurise

To allow the system to operate at atmospheric pressure

To provided sufficient oxygen to the heating system

To provide a means of ventilation when filling the system

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of heating system incorporates a 3 port valve that gives priority to the hot water system?

S plan

S plan +

Y plan

W plan

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What 3 components are required when converting an open vented system with a sealed system?

Auto air vent, low loss header & filling loop

Filling loop, expansion vessel & pressure gauge

Pressure relief valve, filling loop & expansion vessel

Expansion vessel, auto air vent & pressure gauge

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?