Phase 1 central heating mock test

Phase 1 central heating mock test

Vocational training

16 Qs

quiz-placeholder

Similar activities

LO5 ac 5.1

LO5 ac 5.1

KG - University

11 Qs

Quarterly Review Test – Production Technology

Quarterly Review Test – Production Technology

9th Grade - University

20 Qs

multi trade C&G level 1

multi trade C&G level 1

11th Grade

18 Qs

Hearth and Surround

Hearth and Surround

KG - University

20 Qs

Measurement Math Quiz

Measurement Math Quiz

9th - 12th Grade

12 Qs

Communication 6035 part 1

Communication 6035 part 1

KG - University

15 Qs

Communication part 1

Communication part 1

Professional Development

19 Qs

306 hot water systems 1 Quiz

306 hot water systems 1 Quiz

2nd Grade - University

20 Qs

Phase 1 central heating mock test

Phase 1 central heating mock test

Assessment

Quiz

Construction

Vocational training

Medium

Created by

Luke Rock

Used 3+ times

FREE Resource

16 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What heating system uses a difference in the density of water to circulate heat to a hot water cylinder?

Y Plan

Gravity fed

S Plan +

Hypocaust

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The conservation of fuel and energy is covered by which approved document?

P

M

H

L

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main purpose of a central heating system?

To heat up the core of the building

To provide thermal comfort

To supply heating to a single room

To provide heat to a number of properties

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the highest point of a vented heating system?

Expansion vessel

F&E cistern

Cold feed isolation valve

Automatic air vent

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary function of the open vent on a heating system?

To allow the system to pressurise

To allow the system to operate at atmospheric pressure

To provided sufficient oxygen to the heating system

To provide a means of ventilation when filling the system

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of heating system incorporates a 3 port valve that gives priority to the hot water system?

S plan

S plan +

Y plan

W plan

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What 3 components are required when converting an open vented system with a sealed system?

Auto air vent, low loss header & filling loop

Filling loop, expansion vessel & pressure gauge

Pressure relief valve, filling loop & expansion vessel

Expansion vessel, auto air vent & pressure gauge

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?