1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Six 9s of quality is a measure of quality control equal to 1 fault in ____ million opportunities.

1

5

6

9

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A ____ chart is a graphic display of data that illustrates the results of a process over time.

calendar

control

time

procedural

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The seven ____ rule states that if seven data points in a row are all below the mean, above the mean, or are all increasing or decreasing, then the process needs to be examined for nonrandom problems.

qualities

point

straight

run

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A(n) ____ test is done to test each individual component (often a program) to ensure it is as defect-free as possible.

user

integration

unit

system

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

____ testing ensures subsets of the entire system work together.

User

Integration

Unit

System

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

____ testing focuses on the big picture to ensure the entire system is working properly.

User

Integration

Unit

System

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

____ acceptance testing is an independent test performed by end users prior to accepting the delivered system.

User

Integration

Unit

System

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?