1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Six 9s of quality is a measure of quality control equal to 1 fault in ____ million opportunities.
1
5
6
9
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A ____ chart is a graphic display of data that illustrates the results of a process over time.
calendar
control
time
procedural
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The seven ____ rule states that if seven data points in a row are all below the mean, above the mean, or are all increasing or decreasing, then the process needs to be examined for nonrandom problems.
qualities
point
straight
run
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A(n) ____ test is done to test each individual component (often a program) to ensure it is as defect-free as possible.
user
integration
unit
system
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
____ testing ensures subsets of the entire system work together.
User
Integration
Unit
System
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
____ testing focuses on the big picture to ensure the entire system is working properly.
User
Integration
Unit
System
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
____ acceptance testing is an independent test performed by end users prior to accepting the delivered system.
User
Integration
Unit
System
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?