Site preparation and fabrication techniques

Site preparation and fabrication techniques

Vocational training

40 Qs

quiz-placeholder

Similar activities

sanitation ph23 prt1

sanitation ph23 prt1

2nd - 5th Grade

35 Qs

CENTRAL HEATING MOCK EXAM

CENTRAL HEATING MOCK EXAM

12th Grade - University

40 Qs

phase 1 hot water

phase 1 hot water

KG - 1st Grade

45 Qs

PPT 10 - Replace defective components

PPT 10 - Replace defective components

12th Grade - University

37 Qs

Cold Water Installation Techniques

Cold Water Installation Techniques

KG - University

40 Qs

Copper Pipe Joining Quiz

Copper Pipe Joining Quiz

12th Grade

44 Qs

Plumbing Scientific Principles Quiz

Plumbing Scientific Principles Quiz

12th Grade

40 Qs

Maintenance 6035 Revision

Maintenance 6035 Revision

Professional Development

40 Qs

Site preparation and fabrication techniques

Site preparation and fabrication techniques

Assessment

Quiz

Construction

Vocational training

Easy

Created by

Colin Allen

Used 4+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 2 pts

Which of the following is the most suitable method for joining copper pipes in domestic plumbing installations?

Solvent welding

Soldering

Threaded joints

Compression fittings

Answer explanation

Soldering is the most suitable method for joining copper pipes in domestic plumbing because it creates a strong, permanent bond that is resistant to leaks, making it ideal for water supply lines.

2.

MULTIPLE CHOICE QUESTION

2 mins • 2 pts

What is the primary reason for conducting a risk assessment before starting pipework installation on site?

To estimate the cost of materials

To identify and control potential hazards

To determine the length of pipe required

To check the water pressure

Answer explanation

The primary reason for conducting a risk assessment before pipework installation is to identify and control potential hazards. This ensures safety and compliance with regulations, minimizing risks during the installation process.

3.

MULTIPLE CHOICE QUESTION

2 mins • 2 pts

Which material is most commonly used for hot and cold water supply pipes in modern UK domestic plumbing?

Lead

Copper

Cast iron

Galvanised steel

Answer explanation

Copper is the most commonly used material for hot and cold water supply pipes in modern UK domestic plumbing due to its durability, resistance to corrosion, and excellent thermal conductivity.

4.

MULTIPLE CHOICE QUESTION

2 mins • 2 pts

When cutting plastic pipe, which tool is most appropriate to achieve a clean, square cut?

Hacksaw

Pipe slice

Pipe cutter

Plastic pipe shears

Answer explanation

Plastic pipe shears are specifically designed for cutting plastic pipes, providing a clean and square cut. Other tools like hacksaws and pipe cutters may not achieve the same precision.

5.

MULTIPLE CHOICE QUESTION

2 mins • 2 pts

Which of the following is a key safety procedure when working at height during pipework installation?

Wearing a dust mask

Using a harness and secure platform

Using insulated gloves

Wearing ear defenders

Answer explanation

Using a harness and secure platform is crucial for safety when working at height, as it prevents falls and ensures stability during pipework installation. The other options do not address height-related risks.

6.

MULTIPLE CHOICE QUESTION

2 mins • 2 pts

What is the main advantage of using push-fit fittings for pipework?

They require soldering

They are permanent and cannot be removed

They are quick and easy to install

They are only suitable for metal pipes

Answer explanation

The main advantage of push-fit fittings is that they are quick and easy to install, allowing for faster assembly without the need for soldering or special tools, making them ideal for various plumbing applications.

7.

MULTIPLE CHOICE QUESTION

2 mins • 2 pts

Which of the following should be checked before commencing any pipework fabrication on site?

The weather forecast

The availability of tea and coffee

The presence of existing services and utilities

The number of workers on site

Answer explanation

Before starting pipework fabrication, it's crucial to check for the presence of existing services and utilities to avoid damaging them and ensure safety. This is more critical than other factors like weather or refreshments.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?