Progression revision 2

Progression revision 2

Professional Development

11 Qs

quiz-placeholder

Similar activities

Concepts of Generative AI

Concepts of Generative AI

Professional Development

12 Qs

8710 unit 6 ppt 4

8710 unit 6 ppt 4

Professional Development

13 Qs

Introduction to Machine Learning

Introduction to Machine Learning

KG - Professional Development

10 Qs

Soil and Environmental Degradation

Soil and Environmental Degradation

Professional Development

14 Qs

Lesson 3: Introduction to EIA

Lesson 3: Introduction to EIA

Professional Development

10 Qs

Waterfowl Habitat Management

Waterfowl Habitat Management

Professional Development

10 Qs

Thinking Green

Thinking Green

10th Grade - Professional Development

10 Qs

EISS

EISS

Professional Development

10 Qs

Progression revision 2

Progression revision 2

Assessment

Quiz

Science

Professional Development

Hard

Created by

Mitchell Whatley

FREE Resource

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following best describes the purpose of a construction method statement?

To provide a detailed plan for managing project finances.

To outline the process and safety measures for carrying out a specific task on-site.

To record the daily progress of a construction project.

To communicate the design specifications and materials to be used.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of a risk assessment in a construction project?

To evaluate the design of the building for aesthetic appeal.

To identify potential hazards and implement measures to minimize risks to health and safety.

To ensure the project is completed within the budget.

To outline the qualifications and roles of the construction team.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following best describes a construction plan?

A document that lists the daily tasks of construction workers.

A detailed drawing or blueprint outlining the layout, design, and dimensions of a building.

A financial statement showing project costs.

A record of all changes made during the construction process.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In construction drawings, what does the term "scale" refer to?

The cost estimation of the project.

The ratio between the size of the drawing and the actual size of the structure.

The number of workers required on-site.

The height of the building.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a construction project, what is the purpose of a specification document?

To provide financial details about the project.

To detail the required materials, workmanship, and standards for the construction.

To list the names of all contractors involved.

To provide a timeline for project completion.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main purpose of a site induction in construction?

To introduce workers to the project team.

To familiarize workers with site-specific health and safety procedures, hazards, and regulations.

To check the qualifications of workers on-site.

To discuss the project’s budget and timeline.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a "toolbox talk" in the context of construction?

A detailed project management meeting.

A short, informal meeting focused on addressing specific health and safety issues.

A session where workers are trained on the use of new tools.

A review of the project’s timeline and milestones.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?