1.
MULTIPLE CHOICE QUESTION
30 sec • 10 pts
ตาม ITP Quality Intervention points : H ย่อมาจากอะไร
Witness Point
Spot Witness Point
Hold Point
Inform Point
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
โครงการนี้ ITR ที่ใช้ในการเขียน Punch List คือข้อใด
ITR-W-0115X-S
ITR-W-0116X-S
ITR-W-0117X-S
ITR-W-0120A-S
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Punch Description ของ Punch “A” คือข้อใด
Shall be cleared prior to Pre-Commissioning
Shall be cleared prior to the reinstatement
Shall be cleared prior to the hydrotest
Shall be cleared prior to the commissioning
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
ข้อใดต่อไปนี้ไม่อยู่ในกลุ่ม Punch Category “A”
RLM Isometrics and PEFS to be attached in all test packs
Secondary welded support not yet installed
Out of plumbness, levelness, mis-alignment
Check the slope if required by isometric drawings.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
ข้อใดต่อไปนี้ไม่อยู่ในกลุ่ม Punch Category “B”
Temporary supports for the hydrotest shall be removed
Secondary welded support not yet installed
Out of plumbness, levelness, mis-alignment
Spectacle blind and spacer to be installed after test
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
อุปกรณ์ใดต่อไปนี้ไม่เกี่ยวข้องกับงาน Line check
Welding gauge
ตลับเมตร
Infrared thermometer
ระดับน้ำ
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
ใน Isometrics ระบุ Slop 1 : 200 mm. ถ้าความยาวท่อที่ 1500 mm. จะมีค่า Slop เท่ากับกี่ mm.
6 mm.
6.5 mm.
7 mm.
7.5 mm.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?