Engineering Work Related Problems

Engineering Work Related Problems

8th Grade

10 Qs

quiz-placeholder

Similar activities

PLTW Automation and Robotics

PLTW Automation and Robotics

7th - 8th Grade

14 Qs

10/1

10/1

8th Grade

7 Qs

Biotechnology Tools

Biotechnology Tools

8th Grade - University

15 Qs

Water Pollution and Conservation

Water Pollution and Conservation

3rd Grade - University

15 Qs

SOL Review - 6.8.b & 6.9.c - Watershed and Water Quality

SOL Review - 6.8.b & 6.9.c - Watershed and Water Quality

8th Grade

10 Qs

8th Grade Science EOG Review (NC 8.P.2 & 8.E.1)

8th Grade Science EOG Review (NC 8.P.2 & 8.E.1)

6th - 8th Grade

14 Qs

Climate Change Influences Pre-assessment

Climate Change Influences Pre-assessment

8th Grade

14 Qs

Biotechnology

Biotechnology

8th Grade

13 Qs

Engineering Work Related Problems

Engineering Work Related Problems

Assessment

Quiz

Science

8th Grade

Easy

Created by

Jaan Ansari

Used 1+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In manufacturing, what is a common problem that can lead to delays in production?

Overstaffing

Machine breakdowns

Too many raw materials

Excessive product demand

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following best describes a quality control problem in a factory?

Products are made faster than expected

Products do not meet the required standards

Workers are paid more than average

The factory is located far from the city

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is an example of an interpersonal problem in an engineering team?

Lack of raw materials

Disagreements between team members

Power failure

Outdated machinery

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a way to improve quality control in manufacturing?

Ignoring customer complaints

Regularly inspecting products

Reducing staff training

Using cheaper materials

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a possible consequence of poor communication in an engineering team?

Faster project completion

Increased number of errors

Lower costs

Improved teamwork

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is an example of a manufacturing problem?

Employees taking regular breaks

Shortage of raw materials

Having a clean workspace

Using safety equipment

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a potential effect of outdated technology in a factory?

Improved product quality

Increased production costs

Faster production times

Enhanced worker safety

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?