Ensayo de Transformadores

Ensayo de Transformadores

12th Grade

10 Qs

quiz-placeholder

Similar activities

Recruitment Methods Quiz

Recruitment Methods Quiz

12th Grade

10 Qs

Suzerain, Sordland Quiz

Suzerain, Sordland Quiz

9th - 12th Grade

15 Qs

CJ 1 Midterm Practice - Unit 1, lesson 1

CJ 1 Midterm Practice - Unit 1, lesson 1

9th - 12th Grade

15 Qs

Futura Alfa Quiz

Futura Alfa Quiz

12th Grade

10 Qs

Functional Structure Concepts

Functional Structure Concepts

12th Grade

15 Qs

juego

juego

12th Grade

9 Qs

Quizzes to those absent (CW-G2)

Quizzes to those absent (CW-G2)

12th Grade

10 Qs

Ensayo de Transformadores

Ensayo de Transformadores

Assessment

Quiz

Others

12th Grade

Practice Problem

Hard

Created by

Abel Serú

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main objective of the no-load test on a single-phase transformer?

Determine losses in the windings

Determine losses in the core and magnetizing current

Calculate short-circuit impedance

Verify the transformation ratio

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the no-load test, where is the ammeter connected to take measurements?

In series with the secondary winding

In parallel with the primary winding

In series with the primary winding

In parallel with the secondary winding

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During the short-circuit test of a single-phase transformer, the secondary winding must be:

Connected to a resistive load

Open-circuited

Short-circuited

Connected to another transformer

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What percentage of the nominal voltage is typically applied to the primary winding during the short-circuit test?

100%

50%

5-15%

75%

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What problem can indicate excessive no-load current during the no-load test?

Short circuit between turns in the secondary

Problems in the magnetic core

High short-circuit impedance

Poor insulation quality between windings

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the short-circuit test, what instrument is used to measure losses in the windings?

Voltmeter

Ammeter

Wattmeter

Frequency meter

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What electrical risk is sought to be detected when abnormal heating of the core is observed during the no-load test?

Overvoltages in the secondary winding

Short circuits between core laminations

Poorly sized windings

Low energy efficiency

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?