Assertion (A): Stack effect improves indoor air quality. Reason (R): Warm air rises and exits through upper vents, drawing in cooler air.
Answer explanation
Stack effect enables passive cooling by air movement through temperature difference.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Assertion (A): Grouping of rooms improves privacy and utility. Reason (R): Grouping places the kitchen near the bathroom for easy access.
Answer explanation
Grouping enhances function but kitchen near bathroom is not hygienic.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Assertion (A): Vertical circulation allows access to upper floors. Reason (R): It is provided by ramps, stairs, and elevators.
Answer explanation
Vertical circulation includes stairs, ramps, and elevators for movement between floors.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Assertion (A): Fire escape staircases are mandatory in high-rise buildings. Reason (R): High-rise buildings have more than four floors or are 16 m high.
Answer explanation
High-rise buildings per KMBR must have 2 staircases including fire escape.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Assertion (A): The key map must indicate the north direction and landmarks. Reason (R): It is submitted along with the building permit to identify the site location.
Answer explanation
Key maps help locate the site accurately with orientation and references.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the minimum clear width of access required for a multiple occupancy two-storey building?
Answer explanation
As per KMBR, two-storey multiple occupancy buildings need 3.6 m clear access.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Minimum vertical clearance from a high voltage line (up to 33 kV) to a building is:
Answer explanation
The minimum vertical clearance for up to 33kV lines is 3.7 m.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?