1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary goal of the Management of Change (MOC) process?

To track maintenance schedules and spare part inventory

To evaluate financial cost before making business decisions

To assess risks and control impacts before implementing changes

To reduce project approval timeliness

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

While the cost is not much and no capital is required, moving the Injection Molding machine from the end of the line to the middle of the line in the same building does not require an MOC.

True

False

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of checking that all safety equipment, such as fire extinguishers, safety showers, and eyewash stations, are installed and accessible in a Pre-Start EHS Review (PSER) in the MOC process?

To finalize the project budget

To confirm that the change has considered potential impacts and required mitigating steps before full implementation

To train new employees

To document minor changes in procedures

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

All of the following are valid reasons to trigger a Management of Change review for a chemical change, EXCEPT:

A solvent is switched to reduce flammability risks

A cleaning agent is changed to comply with VOC limits

A colorant is reformulated with similar chemical for cosmetic enhancement

A new additive is introduced, require updated emissions permitting

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Procedure changes affecting how a hazardous material is handled must go through MOC even if the material itself is unchanged.

True

False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who is the primary responsible person to approve MOC request:

The initiator of the MOC

EHS department head

Site Engineering Lead

Site Operations Lead

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When the site does not have a Site Engineer Lead, the Site Operations Lead shall assume the approval process?

True

False

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?