D31 QUIZ OF THE DAY

D31 QUIZ OF THE DAY

University

30 Qs

quiz-placeholder

Similar activities

ME113B Midterm Exam Part 1

ME113B Midterm Exam Part 1

University

25 Qs

D35 FACE THE CHALLENGE

D35 FACE THE CHALLENGE

University

30 Qs

D32 face the challenge

D32 face the challenge

University

30 Qs

Density on the Conventional Radiograph

Density on the Conventional Radiograph

University - Professional Development

25 Qs

Errors

Errors

University - Professional Development

34 Qs

D15 CHECK YOUR LEVEL

D15 CHECK YOUR LEVEL

University

30 Qs

D21 QUIZ OF THE DAY

D21 QUIZ OF THE DAY

University

25 Qs

Sucesiones Afanuméricas

Sucesiones Afanuméricas

12th Grade - University

25 Qs

D31 QUIZ OF THE DAY

D31 QUIZ OF THE DAY

Assessment

Quiz

Professional Development

University

Medium

Created by

WINCENTRE CLASSES

Used 1+ times

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In earthwork, the volume of excavation for a foundation trench is calculated as:
Length × Width
Length × Depth
Length × Breadth × Depth
Breadth × Height

Answer explanation

Excavation volume is calculated using Length × Breadth × Depth of the trench.

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Assertion (A): The volume of concrete for foundation is measured in cubic meters. Reason (R): Concrete work includes formwork and reinforcement.
Both A and R are true and R is the correct explanation of A
Both A and R are true but R is not the correct explanation of A
A is true but R is false
A is false but R is true

Answer explanation

A is true; concrete is measured in m³. R is partially true—formwork and reinforcement are not included in concrete volume.

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which unit is used for measuring plastering work?
Cubic meter
Running meter
Square meter
Number

Answer explanation

Plastering is measured in square meters (Length × Height) on both faces unless specified otherwise.

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In measurement, deductions for masonry openings are not made when the opening area is:
More than 0.3 sq.m
More than 1.0 sq.m
Less than or equal to 0.1 sq.m
More than 2.0 sq.m

Answer explanation

No deductions are made for openings up to 0.1 m² in masonry work as per standard rules.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following is the correct deduction formula for rectangular door openings in masonry?
Height × Width
Length × Height × Wall thickness
Breadth × Height
Length × Wall thickness

Answer explanation

For masonry, full volume is deducted as Length × Height × Wall thickness for door openings.

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the standard lead and lift considered for earthwork measurement?
30 m lead and 1.0 m lift
50 m lead and 2.0 m lift
30 m lead and 1.5 m lift
50 m lead and 1.5 m lift

Answer explanation

The standard lead and lift for earthwork is 30 meters horizontal and 1.5 meters vertical as per PWD norms.

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following is measured in running meters?
Plastering
Soling
Cornice
Painting

Answer explanation

Cornices and other linear features like drip course and coping are measured in running meters.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?