D40 MASTER THE DAY

D40 MASTER THE DAY

Professional Development

100 Qs

quiz-placeholder

Similar activities

106 Final Exam

106 Final Exam

Professional Development

100 Qs

PK PC1250-8

PK PC1250-8

Professional Development

100 Qs

Common pool for D9

Common pool for D9

Professional Development

97 Qs

Routine Inspections (900.00-900.09)

Routine Inspections (900.00-900.09)

Professional Development

100 Qs

Aerospace 1

Aerospace 1

KG - Professional Development

96 Qs

Dc Circuits TEST OUT

Dc Circuits TEST OUT

Professional Development

100 Qs

Engineering Management

Engineering Management

Professional Development

100 Qs

IoT

IoT

University - Professional Development

100 Qs

D40 MASTER THE DAY

D40 MASTER THE DAY

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

WINCENTRE CLASSES

FREE Resource

100 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

If the gross head is 100 m and net head is 70m, what is the hydraulic efficiency?

80%

70%

60%
20%

Answer explanation

Hydraulic efficiency = Net Head / Gross Head = 70/100 = 0.7or 70%.

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Ratio of actual energy to maximum possible energy is

Installed capacity

Capacity factor

Overall efficiency
Head loss

Answer explanation

Capacity factor is the ratio of actual energy produced to the maximum possible energy over a time period.

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which type of turbine is suitable for medium head and discharge?
Kaplan
Francis
Pelton
Turgo

Answer explanation

Francis turbines are best suited for medium head and medium discharge.

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Where is the surge tank located in a hydroelectric system?
Upstream of turbine
Inside power house
At tailrace
Below draft tube

Answer explanation

Surge tanks are located upstream on the penstock to reduce water hammer.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which component helps maintain constant pressure before the turbine?
Forebay
Surge tank
Penstock
Spillway

Answer explanation

Surge tanks absorb sudden changes in pressure.

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the function of a penstock?
Store water
Generate electricity
Control voltage
Deliver water under pressure

Answer explanation

Penstocks carry water under pressure to the turbine.

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Draft tubes are provided to:
Reduce cavitation
Increase velocity
Generate power
Transfer energy

Answer explanation

Draft tubes reduce cavitation and recover pressure.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?