Materials Engineer Exam Questions

Materials Engineer Exam Questions

University

99 Qs

quiz-placeholder

Similar activities

Honors Geometry Circles Unit Review

Honors Geometry Circles Unit Review

9th Grade - University

103 Qs

TEST BANK 7

TEST BANK 7

University

100 Qs

Math Final Exam Practice

Math Final Exam Practice

7th Grade - University

102 Qs

BLUEBOOK (1-100)

BLUEBOOK (1-100)

University

99 Qs

Graphing

Graphing

University - Professional Development

101 Qs

Esas macapagal

Esas macapagal

University

100 Qs

Wrap Up  to Unit 1

Wrap Up to Unit 1

9th Grade - University

100 Qs

QB01KDJ8SJCK

QB01KDJ8SJCK

University - Professional Development

100 Qs

Materials Engineer Exam Questions

Materials Engineer Exam Questions

Assessment

Quiz

Mathematics

University

Medium

Created by

rey moralde

Used 5+ times

FREE Resource

99 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Field offices and living quarters shall be constructed within months upon the commencement of the Works.

1 month

2 months

3 months

4 months

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Field Office and other facilities provided by the contractor shall be within the radius or preferably near the job site.

3.0 km

4.0 km

5.0 km

2.50 km

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Based on Survey and staking requirements, when the centerline horizontal curve radius is less than or equal to 150 m and vertical parabolic curve radius is less than or equal to 100 m, cross-sections shall be taken at a maximum centerline spacing of __.

5.0 m

10.0 m

15.0 m

20.0 m

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Based on Survey and staking requirements, when the centerline horizontal curve radius is greater than 150 m and vertical parabolic curve radius is greater than 100 m, cross-sections shall be taken at a maximum centerline spacing of __.

5.0 m

10.0 m

15.0 m

20.0 m

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If the slag is used in structural concrete, its density shall not be less than

1,120 kg/m3

980 kg/m3

1,150 kg/m3

960 kg/m3

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fly Ash, if specified or permitted as a mineral admixture, it shall not exceed partial replacement of Portland Cement in concrete mix.

5.0%

10%

15%

20%

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum stacking layer of cement if the storage period is more than 60 days?

10 layers

7 layers

12 layers

14 layers

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?