Implementation Methods Quiz

Implementation Methods Quiz

11th Grade

15 Qs

quiz-placeholder

Similar activities

OCR Sys Arch J277

OCR Sys Arch J277

10th - 12th Grade

16 Qs

ITGS - IT Systems (Hardware)

ITGS - IT Systems (Hardware)

10th - 12th Grade

14 Qs

Internet Basics

Internet Basics

5th Grade - University

15 Qs

flowol week 3

flowol week 3

9th - 12th Grade

17 Qs

Operating system

Operating system

11th - 12th Grade

10 Qs

Computer Security Measure

Computer Security Measure

11th Grade - University

19 Qs

Magistrale i gniazda rozszerzeń

Magistrale i gniazda rozszerzeń

11th Grade

11 Qs

UAS Administrasi Infrastruktur Jaringan - Routing Dinamis

UAS Administrasi Infrastruktur Jaringan - Routing Dinamis

11th Grade

20 Qs

Implementation Methods Quiz

Implementation Methods Quiz

Assessment

Quiz

Computers

11th Grade

Practice Problem

Medium

Created by

Wan Izyani

Used 4+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Which implementation method involves immediately replacing the old system with the new system at a specific point in time?

Parallel Running Method

Direct Changeover Method

Pilot Running Method

Phased Implementation Method

2.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

What is a major risk associated with the Direct Changeover Method?

High cost due to running two systems

No fallback if the new system fails

Slow implementation process

Only a small group uses the new system first

3.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Which method involves running both the old and new systems simultaneously for a period of time?

Direct Changeover Method

Parallel Running Method

Pilot Running Method

Phased Implementation Method

4.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

What is the main advantage of the Parallel Running Method?

It is the fastest method

It allows for comparison and reduces risk

It is the cheapest method

Only a small group is affected

5.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Which implementation method introduces the new system to a small part of the organization before a full rollout?

Direct Changeover Method

Parallel Running Method

Pilot Running Method

Phased Implementation Method

6.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

What is the main purpose of using the Pilot Running Method?

To save costs by not running two systems

To test the new system in a controlled environment

To implement the system as quickly as possible

To implement the system in stages

7.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Which method involves implementing the new system in stages or modules?

Direct Changeover Method

Parallel Running Method

Pilot Running Method

Phased Implementation Method

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email