ID Interior Construction & Utilities

ID Interior Construction & Utilities

2nd Grade

30 Qs

quiz-placeholder

Similar activities

Practice Ratio and Proportion

Practice Ratio and Proportion

KG - University

25 Qs

Time and Money

Time and Money

1st - 4th Grade

25 Qs

LOCI IN TWO DIMENSIONS

LOCI IN TWO DIMENSIONS

1st - 3rd Grade

25 Qs

Finding Perimeters

Finding Perimeters

2nd - 3rd Grade

25 Qs

Coin Counting and Comparisons

Coin Counting and Comparisons

2nd - 3rd Grade

25 Qs

Place Value and Digit Value

Place Value and Digit Value

2nd - 3rd Grade

26 Qs

Fractions and Decimals

Fractions and Decimals

1st - 8th Grade

25 Qs

Geomtry final Review

Geomtry final Review

KG - Professional Development

25 Qs

ID Interior Construction & Utilities

ID Interior Construction & Utilities

Assessment

Quiz

Mathematics

2nd Grade

Medium

Created by

Renato Santos

Used 1+ times

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The visible woodworks, plasterworks or moldings of the building and room which covers or protect the joints and edges of other materials.

Sash Works     

Millworks

Finish Trims

Wood Bands

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

A braced framework usually in some triangular arrangement and used to hold up the roof.

Rafter

Truss   

Purlins

Turn Buckle

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

One square meter of T&G flooring will require 0.20 kgs. Of 1-1/2” finishing nails. How many kilos of this nail is required if the floor measures 4000mm x 5000mm?

2.0 kgs.

6.0 kgs.

4.0 kgs.

1.0 kgs.

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Find the quantity of a 4” thick Concrete Hollow Block for a wall measuring 2000mm x 200000mm. Assume there are 13 pcs. Of CHB per square meter.

520 pcs.

510 pcs.

620 pcs.

500 pcs.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A gallon of paint at one coat application will cover approximately 25 square meters. Determined the total number of gallons of paints required for a 16.25mts. x 18.85mts. wall. This wall will need two coats of paint.

26 gallons

27 gallons

25 gallons

22 gallons

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The proper proportion of CLASS “A” concrete is.

1:3:6

1:1-1/2:5

1: 1-1/2:3

1:2:3

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The wood or metal construction which holds the fresh concrete in place until it has hardened.

Scaffoldings

Formworks   

Staging

Brackets

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?