Unit07-Final(Knowledge)-3

Unit07-Final(Knowledge)-3

12th Grade

20 Qs

quiz-placeholder

Similar activities

BI Trivia

BI Trivia

9th - 12th Grade

20 Qs

Disney Personalities

Disney Personalities

5th Grade - University

15 Qs

AVID Acronyms

AVID Acronyms

6th - 12th Grade

24 Qs

General knowledge

General knowledge

3rd Grade - University

20 Qs

SciVis I Unit 6 B

SciVis I Unit 6 B

9th - 12th Grade

15 Qs

Pop Culture Trivia 2020

Pop Culture Trivia 2020

KG - Professional Development

15 Qs

DofE training refresher

DofE training refresher

10th - 12th Grade

18 Qs

Fantastic beasts The crimes of Grindelwald

Fantastic beasts The crimes of Grindelwald

1st Grade - University

20 Qs

Unit07-Final(Knowledge)-3

Unit07-Final(Knowledge)-3

Assessment

Quiz

Other

12th Grade

Practice Problem

Hard

Created by

Ashraf Napih

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The records of raw material with respect to 'Material stock record' are sent for sampling to:

QA

RA

CQ

QR

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The missing step in the 'Document life cycle' shown is:

Audition

Destruction

Verification

Distortion

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The 'Building commissioning process covers:

The entire duration of the building delivery process

Only the initiation phase of the construction project

Primarily the crucial monitoring and controlling stage

Technical inspection, testing and measurement activities

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The building performance of equipment and systems are accomplished in the 'Building Acquisition phase' of:

Construction

Design

Occupancy

Monitoring

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The process of confirmation of project systems to check compliance with the criteria described in the Owner's Project Requirements is called:

Verification

Modification

Execution

Construction

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Sampling results for materials are most appropriately documented in:

RM analytical record

Design technical drawings

Safety inspection reports

Occupational safety audits

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The phase of the building acquisition shown in which the owner establishes objectives for the facility has the number of:

4

3

2

1

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?