Unit07-Final(60MCQ)

Unit07-Final(60MCQ)

12th Grade

60 Qs

quiz-placeholder

Similar activities

Animal  & Plant Science (Ag Certification Practice 2)

Animal & Plant Science (Ag Certification Practice 2)

9th - 12th Grade

60 Qs

inspection class terms

inspection class terms

12th Grade - University

60 Qs

Level 2 Health & Safety - Legislation [Long]

Level 2 Health & Safety - Legislation [Long]

12th Grade - University

57 Qs

Core 01 Health & Safety

Core 01 Health & Safety

KG - University

58 Qs

Mock Test - Unit 303 Marine Engineering

Mock Test - Unit 303 Marine Engineering

12th Grade

62 Qs

JROTC LET 1 Cadet of the Month

JROTC LET 1 Cadet of the Month

9th - 12th Grade

57 Qs

Unit08-Final(60MCQ)

Unit08-Final(60MCQ)

12th Grade

60 Qs

Post Test in TLE 7

Post Test in TLE 7

7th Grade - University

60 Qs

Unit07-Final(60MCQ)

Unit07-Final(60MCQ)

Assessment

Quiz

Other

12th Grade

Medium

Created by

Ashraf Napih

Used 3+ times

FREE Resource

60 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Converting the owner's requirements and objectives into construction documents is the main duty in the phase of:

Commissioning

Design

Occupancy

Operations

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The defect as per AQL charts that could cause harm can be described as:

Strong

Critical

Sensitive

Hard

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Commissioning can be described as:

Main project phase

Progressing process

Design initiation

Scope and budget

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

"AQL" stands for:

Acceptable Quality Limit

Accepted Quality Link

Agreed Quality Lessons

Accept Qualifications Level

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

In the "Design" phase of the building acquisition process shown the letter "A" is:

Defects punch list

Operations manual

Construction documents

Inspection check list

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

"Major defects" are usually assigned the percentage of AQL of:

6

2.5

0.5

0

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

"Poor communication" in project construction could lead to:

Defective Guarding

Multi-phase projects

Incomplete objectives

Increased change orders

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?